Permit: TC-MDP-0824-00900
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6230 S SOUTHLAND BL
Address NEW:
6230 S SOUTHLAND BL
Apply Date:
10/21/2024
Applicant:
Ramon VALDEZ
Description:
SFR VALD00122 T22-M0013
Permit Reviews
Permit Number - TC-MDP-0824-00900
Permit Status: Complete
Permit Description: SFR VALD00122 T22-M0013
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/24/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 11/19/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00900
Permit Status: Complete
Permit Description: SFR VALD00122 T22-M0013
| Date | Description | Comments |
|---|---|---|
| 11/19/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00900
Permite Description: SFR VALD00122 T22-M0013
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | 11/25/24: Trench down 12 inches below natural grade. Please, provide approved set of plans. Provide address label on site. 11/26/24: corrections made ok to proceed. partial for UFER |
| 02/26/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | Site does not use gas |
| 02/26/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable | No underground electric |
| 02/26/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Site does not use gas |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00900
Permit Description: SFR VALD00122 T22-M0013
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | COT - RSPL - Yard Water Line | Passed | 11/20/24: plumbing underground per plans. shading required. ok to backfill | |
| 11/20/2024 | COT - RSPL - Rough Soil | Passed | 11/20/24: plumbing underground per plans. ok to backfill. shading required | |
| 11/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11/25/24: Trench down 12 inches below natural grade. Please, provide approved set of plans. Provide address label on site. 11/26/24: corrections made ok to proceed. |
|
| 11/26/2024 | COT - RSBU - Preslab | Passed | 11/25/24: Trench down 12 inches below natural grade. Please, provide approved set of plans. Provide address label on site. 11/26/24: corrections made ok to proceed. |
|
| 12/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Hold downs and roof nailing per plans 12/16/24 | |
| 12/16/2024 | COT - RSBU - Roof Nailing | Passed | Hold downs and roof nailing per plans 12/16/24 | |
| 12/18/2024 | BULD - Electrical Clearance | Passed | passed 12/18/24 CLEARANCE ECO ready for temp power | |
| 12/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/18/2024 | COT - RSEL - Grounding/Bonding | Passed | passed 12/18/24 | |
| 01/17/2025 | COT - RSPL - Sewer | Passed | 01/17/25 Ok to backfill, shading required. |
|
| 02/26/2025 | COT - RSEL - Electrical Final | Passed | Passed final 2/26/25 CLEARANCE ECO | |
| 02/26/2025 | COT - RSEL - Outdoor Lighting | Passed | PASSED FINAL 2/26/25 | |
| 02/26/2025 | COT - RSME - Mechanical Final | Passed | PASSED FINAL 2/26/25 | |
| 02/26/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/26/25 | |
| 02/26/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 02/26/2025 | RSBU - Building Final | Passed | Passed final 2/26/25 | |
| 02/26/2025 | RSBU - Building Progress | Passed | PASSED FINAL 2/26/25 |