Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0824-00896
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
4151 E 22ND ST
Address NEW:
4151 E 22ND ST
Apply Date:
09/06/2024
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037 (Model Master Plan TC-MDP-0123-00341)
Permit Reviews
Permit Number - TC-MDP-0824-00896
Permit Status: Inspections complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (Model Master Plan TC-MDP-0123-00341)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/03/2025 | RESTAMP - RESIDENTIAL v.1 | 01/08/2025 | APPROVED |
| 11/27/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 12/18/2024 | REQUIRES RESUBMIT |
| 09/06/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 09/24/2024 | REQUIRES RESUBMIT |
| 10/14/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 11/06/2024 | REQUIRES RESUBMIT |
| 12/20/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 | 01/03/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00896
Permit Status: Inspections complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (Model Master Plan TC-MDP-0123-00341)
| Date | Description | Comments |
|---|---|---|
| 11/27/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00896
Permite Description: DUPLEX DUPLVAL82 T22-M0037 (Model Master Plan TC-MDP-0123-00341)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 5-9-25, not applicable |
| 05/09/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 5-9-25, not applicable |
| 05/09/2025 | ENGR Engineering Final | N/A | Not Ready | Units 5 and 6 4'x4' utility pads at back doors are 3'x4', not correct to plan. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00896
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (Model Master Plan TC-MDP-0123-00341)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2025 | COT - RSPL - Rough Soil | Passed | ||
| 01/31/2025 | COT - RSPL - Sewer | Passed | ||
| 01/31/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 02/04/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 02/04/2025 | COT - RSBU - Preslab | Passed | Ensure slab area is termite treated before placing concrete. | |
| 02/04/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 02/24/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/24/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 02/26/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2-26-25, intermediates for unit's 7 & 8 approved. Okay to continue with construction | |
| 02/26/2025 | BULD - Electrical Clearance | Passed | 2-26-25, okay to energize unit's 7 & 8. ECO clearance issued to TEP. | |
| 05/09/2025 | COT - RSEL - Electrical Underground | Passed | 5-9-25, approved. | |
| 05/09/2025 | COT - RSEL - Outdoor Lighting | Passed | 5-9-25, outdoor lighting approved. | |
| 05/09/2025 | COT - RSME - Mechanical Final | Passed | 5-9-25, mechanical final approved. | |
| 05/09/2025 | COT - RSPL - Plumbing Final | Passed | 5-9-25, plumbing final approved. | |
| 05/09/2025 | RSBU - Building Progress | Passed | ||
| 05/13/2025 | RSBU - Building Final | Passed | 5-13-25, building final approved. | |
| 05/13/2025 | ENGR Engineering Final | Passed | ||
| 05/13/2025 | COT - RSEL - Electrical Final | Passed | 5-13-25, electrical final approved. | |
| 05/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | 5-13-25, contractor provided photos of interior shear bracing using 5/8" drywall, nailing pattern, and fire wall taping on interior /exterior walls. |