Permit: TC-MDP-0824-00879
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10680 E ROSY MARBLE DR
Address NEW:
10680 E ROSY MARBLE DR
Apply Date:
08/20/2024
Applicant:
Dana Petty
Description:
SFR MER1502320 T21-M0070 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0824-00879
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/03/2024 | APPROVED |
| 01/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/15/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00879
Permit Status: Complete
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
| Date | Description | Comments |
|---|---|---|
| 09/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/15/2025 | Post-Installed Anchor Inspection Report is required. | |
| 09/03/2024 | Post-Tension Inspection Report is required. | |
| 08/22/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/22/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00879
Permite Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 1-22-25, add receptacle to marked area at dining room (over 12 feet from receptacle), add blocking to 4 gang box at den, add firefoam at marked location at garage, unable to locate panel dead plate. |
| 01/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1-22-25, add receptacle to marked area at dining room (over 12 feet from receptacle), add blocking to 4 gang box at den, add firefoam at marked location at garage, unable to locate panel dead plate. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00879
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2024 | COT - RSPL - Backwater Valve | Passed | 11-18-24, backwater valve verified. | |
| 11/18/2024 | COT - RSPL - Yard Water Line | Passed | 11-18-24, main water line verified as per approved plans. Okay to backfill. | |
| 11/18/2024 | COT - RSPL - Sewer | Passed | 11-18-24, sewer connection verified. Okay to backfill-provide shading. | |
| 11/18/2024 | COT - RSPL - Rough Soil | Passed | 11-18-24, underground plumbing verified as per approved plans. Okay to backfill-provide shading. | |
| 11/22/2024 | COT - RSBU - Preslab | Passed | ||
| 11/22/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 11/22/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/16/24 pass | |
| 12/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/16/24 missing an h2.5 at truss G0355. Crew was on site and made correction as well as securing a pantry wall. | |
| 12/16/2024 | COT - RSBU - Roof Nailing | Passed | 12/16/24 missing an h2.5 at truss G0355. Crew was on site and made correction as well as securing a pantry wall. Pass | |
| 01/22/2025 | COT - RSPL - Gas Pressure Test | Passed | 1-22-25, approved. | |
| 01/23/2025 | BULD - Electrical Clearance | Passed | 1-23-25, panel approved to be energized. ECO clearance sent to TEP | |
| 01/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-23-25, approved. Okay to continue with construction | |
| 02/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | Sheet rock for interior shear walls is properly secured to the studs per the plan requirements for interior Okay to proceed with tape, texture, and paint. | |
| 03/19/2025 | COT - BULD - SWG Clearance | Passed | 3-19-25, okay for SWG to install meter. Clearance issued. | |
| 04/04/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/4/25 | |
| 04/04/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/4/25 | |
| 04/04/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/4/25 | |
| 04/04/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/4/25 | |
| 04/04/2025 | ENGR Engineering Final | Passed | Site is good. C of O ready. | |
| 04/04/2025 | RSBU - Building Final | Passed | Passed final 4/4/25 | |
| 04/04/2025 | RSBU - Building Progress | Passed | Passed final 4/4/25 |