Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0824-00879
Permit Details
Apply Date:
08/20/2024
Applicant:
Dana Petty
Description:
SFR MER1502320 T21-M0070 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0824-00879
Permit Status: Issued
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/03/2024 | APPROVED |
01/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/15/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00879
Permit Status: Issued
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Date | Description | Comments |
---|---|---|
09/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
09/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/15/2025 | Post-Installed Anchor Inspection Report is required. | |
09/03/2024 | Post-Tension Inspection Report is required. | |
08/22/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
08/22/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
09/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0824-00879
Permite Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/22/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 1-22-25, add receptacle to marked area at dining room (over 12 feet from receptacle), add blocking to 4 gang box at den, add firefoam at marked location at garage, unable to locate panel dead plate. |
01/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1-22-25, add receptacle to marked area at dining room (over 12 feet from receptacle), add blocking to 4 gang box at den, add firefoam at marked location at garage, unable to locate panel dead plate. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0824-00879
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2024 | COT - RSPL - Backwater Valve | Passed | 11-18-24, backwater valve verified. | |
11/18/2024 | COT - RSPL - Yard Water Line | Passed | 11-18-24, main water line verified as per approved plans. Okay to backfill. | |
11/18/2024 | COT - RSPL - Sewer | Passed | 11-18-24, sewer connection verified. Okay to backfill-provide shading. | |
11/18/2024 | COT - RSPL - Rough Soil | Passed | 11-18-24, underground plumbing verified as per approved plans. Okay to backfill-provide shading. | |
11/22/2024 | COT - RSBU - Preslab | Passed | ||
11/22/2024 | COT - RSEL - Electrical Underground | Passed | ||
11/22/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
12/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/16/24 pass | |
12/16/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 12/16/24 missing an h2.5 at truss G0355. Crew was on site and made correction as well as securing a pantry wall. | |
12/16/2024 | COT - RSBU - Roof Nailing | Passed | 12/16/24 missing an h2.5 at truss G0355. Crew was on site and made correction as well as securing a pantry wall. Pass | |
01/22/2025 | COT - RSPL - Gas Pressure Test | Passed | 1-22-25, approved. | |
01/23/2025 | BULD - Electrical Clearance | Passed | 1-23-25, panel approved to be energized. ECO clearance sent to TEP | |
01/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-23-25, approved. Okay to continue with construction | |
02/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | Sheet rock for interior shear walls is properly secured to the studs per the plan requirements for interior Okay to proceed with tape, texture, and paint. |