Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
4221 N LULU CT
Address NEW:
4221 N LULU CT
Apply Date:
09/06/2024
Applicant:
Erin Harris
Description:
SFR model (Model master plan TC-MDP-0324-00355)

Permit Reviews

Permit Number - TC-MDP-0824-00874
Permit Status: Complete
Permit Description: SFR model (Model master plan TC-MDP-0324-00355)
Start Date Submittal Complete Date Status  
09/12/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/26/2024 REQUIRES RESUBMIT Review Details
10/24/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 11/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0824-00874
Permit Status: Complete
Permit Description: SFR model (Model master plan TC-MDP-0324-00355)
Date Description Comments
08/22/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/22/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00874
Permite Description: SFR model (Model master plan TC-MDP-0324-00355)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/08/2025 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00874
Permit Description: SFR model (Model master plan TC-MDP-0324-00355)
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/26/2024 COT - RSPL - Rough Soil Passed
12/02/2024 COT - RSEL - Grounding/Bonding Passed CALL JUAN 520-248-9180
12/02/2024 COT - RSBU - Preslab Passed CALL JUAN 520-248-9180
12/11/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Approved per Wayne Gallagher. 12/11/2024
12/17/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/17/2024 COT - RSBU - Interior Shear Bracing Passed
12/17/2024 COT - RSBU - Roof Nailing Passed
01/09/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/14/2025 BULD - Electrical Clearance Passed Ok to set meter for new service
03/26/2025 COT - RSPL - Gas Pressure Test Passed
03/14/2025 COT - BULD - SWG Clearance Passed Ok to set meter for service
03/21/2025 COT - RSPL - Sewer Passed Ok to cover progress area.
03/21/2025 COT - RSPL - Yard Water Line Passed Ok to cover progress area.
05/08/2025 COT - RSEL - Electrical Final Passed
05/08/2025 COT - RSEL - Electrical Underground Passed
05/08/2025 COT - RSEL - Outdoor Lighting Passed
05/08/2025 ENGR Engineering Final Passed
10/01/2025 COT - RSPL - Plumbing Final Passed
12/08/2025 COT - RSME - Mechanical Final Passed
12/08/2025 RSBU - Building Final Passed