Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/26/2024
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0824-00870
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
09/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0824-00870
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
Date Name
08/19/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/27/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/27/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/27/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/27/2024 Post-Tension Inspection Report is required.
09/27/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0824-00870
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
08/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/27/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00870
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/15/2025 BULD - Electrical Clearance N/A Canceled Canceled by Johnathan
01/15/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Patch holes in lathe, connect all ductwork

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00870
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/30/2024 COT - RSPL - Backwater Valve Passed Sewer is connected to underground plumbing with backwater valve installed, entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
10/30/2024 COT - RSPL - Rough Soil Passed Sewer is connected to underground plumbing with backwater valve installed, entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
10/30/2024 COT - RSPL - Sewer Passed Sewer is connected to underground plumbing with backwater valve installed, entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
10/30/2024 COT - RSPL - Yard Water Line Passed Water supply is connected to city water and under street pressure with no leaks. Okay to shade pipe and backfill trench.
11/06/2024 COT - RSBU - Preslab Passed Okay to pour concrete.
11/06/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Okay to pour concrete.
11/06/2024 COT - RSEL - Electrical Underground Passed Okay to pour concrete.
11/06/2024 COT - RSEL - Grounding/Bonding Passed Partial pass for Ufer ground. Okay to pour concrete.
12/13/2024 COT - RSBU - Roof Nailing Passed 12/13/24 corrections have been made.
01/15/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 1/15/25
01/15/2025 COT - RSPL - Gas Pressure Test Passed Passed 1/15/25
01/17/2025 BULD - Electrical Clearance Passed Panel is properly installed, ground wire is connected to Ufer ground and gas line. ECO Clearance issued for 12898 E Tortoise Pointe Dr.
01/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/17/25: Holes in vapor barrier have been caulked and all ductwork is properly connected to air registers.
01/31/2025 COT - RSBU - Interior Shear Bracing Passed 1/31/25 pass
03/27/2025 COT - BULD - SWG Clearance Passed 27 March 25
Southwest Gas Clearance: SWG
04/16/2025 COT - RSEL - Electrical Final Passed
04/16/2025 COT - RSEL - Outdoor Lighting Passed
04/16/2025 COT - RSME - Mechanical Final Passed
04/16/2025 COT - RSPL - Plumbing Final Passed
04/16/2025 ENGR Engineering Final Passed See checklist item. I discussed with John issue of address plate.
04/16/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-09-26_V1.PDF DOCUMENTS VIEW