SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0824-00866
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/22/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/28/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0824-00866
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 08/28/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/28/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/28/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/28/2024 | Post-Tension Inspection Report is required. |
| 08/28/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0824-00866
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 08/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00866
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 09/24/2024 | COT - RSPL - Rough Soil | Passed | ||
| 09/24/2024 | COT - RSPL - Sewer | Passed | ||
| 10/03/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/03/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10/3/24: rebar not to plan at entry of ho,e calling for top and bottom rebar wrapping around corner. Optional back patio footings not on plans. 10/4/24: corrections made. |
|
| 10/04/2024 | COT - RSBU - Preslab | Passed | 10/3/24: rebar not to plan at entry of ho,e calling for top and bottom rebar wrapping around corner. Optional back patio footings not on plans. 10/4/24: corrections made. |
|
| 10/30/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay to proceed with rough-in. | |
| 10/30/2024 | COT - RSBU - Roof Nailing | Passed | Okay to proceed with rough-in. | |
| 12/11/2024 | BULD - Electrical Clearance | Passed | 12-11-24, per TEP, screws for installation of metallic address at panel is ok. See TEP Service Requirements for details. ECO clearance issued to TEP. | |
| 12/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12-11-24, intermediates approved. Okay to continue construction. | |
| 12/11/2024 | COT - RSPL - Gas Pressure Test | Passed | 12-11-24, gas pressure test verified at 15 psi. | |
| 12/24/2024 | COT - RSBU - Interior Shear Bracing | Passed | Passed interior shear bracing, ok to tape 12/24/24 | |
| 02/14/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 2/14/25 | |
| 03/11/2025 | COT - RSEL - Electrical Final | Passed | ||
| 03/11/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/11/2025 | COT - RSME - Mechanical Final | Passed | ||
| 03/11/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/11/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 03/11/2025 | RSBU - Building Final | Passed | ||
| 03/11/2025 | RSBU - Building Progress | Passed |