Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/09/2024
Applicant:
Cassidy Fenton
Description:
Six Bay Garage T20-M0047

Permit Reviews

Permit Number - TC-MDP-0824-00859
Permit Status: Complete
Permit Description: Six Bay Garage T20-M0047
Start Date Submittal Complete Date Status  
07/08/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/09/2025 APPROVED Review Details
08/13/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/20/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0824-00859
Permit Status: Complete
Permit Description: Six Bay Garage T20-M0047
Date Description Comments
07/09/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/09/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00859
Permite Description: Six Bay Garage T20-M0047
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
08/22/2024 COT - RSEL - Electrical Underground N/A Not Applicable
08/22/2024 COT - RSBU - Preslab N/A Not Applicable
08/22/2024 COT - RSPL - Rough Soil N/A Not Applicable
08/22/2024 COT - RSPL - Yard Water Line N/A Not Applicable
08/22/2024 COT - RSPL - Sewer N/A Not Applicable
01/08/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
03/19/2025 COT - BULD - SWG Clearance N/A Not Applicable 3-19-25, not applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00859
Permit Description: Six Bay Garage T20-M0047
Total Completed Inspections - 14
Date Description Inspector Results Comments
08/22/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
01/08/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
01/08/2025 COT - RSBU - Roof Nailing Passed
01/08/2025 RSBU - Building Progress Passed
03/19/2025 BULD - Electrical Clearance Passed 3-19-25, panel okay to be energized. ECO clearance issued to TEP.
03/19/2025 COT - RSEL - Grounding/Bonding Passed 3-19-25, grounding/bonding approved
03/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3-21-25, residential intermediate approved. Okay to continue with construction.
04/09/2025 COT - RSBU - Interior Shear Bracing Passed
06/25/2025 COT - RSEL - Outdoor Lighting Passed Passed 6/25/25
06/25/2025 COT - RSPL - Plumbing Final Passed Passed 6/25/25
06/25/2025 ENGR Engineering Final Passed
06/25/2025 RSBU - Building Final Passed Passed 6/25/25
06/25/2025 COT - RSME - Mechanical Final Passed Passed 6/25/25
06/27/2025 COT - RSEL - Electrical Final Passed Passed 6/27/25 CLEARANCE ECO

Documents

File Name Document Type  
149495 PT GARAGE 5-2025-07-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
GARAGE BLDG 5 SIC-2024-08-09_V1.PDF DOCUMENTS VIEW
SITE PLAN GARAGE BLDG 5_V1.PDF DOCUMENTS VIEW