Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01471
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2380 N NORRIS AV
Address NEW:
2380 N NORRIS AV
Apply Date:
08/28/2023
Applicant:
ERICK QUINTERO
Description:
Sunset West Model 1368
Permit Reviews
Permit Number - TC-MDP-0823-01471
Permit Status: Complete
Permit Description: Sunset West Model 1368
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/15/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.4 | 09/18/2023 | APPROVED |
| 08/28/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/31/2023 | REQUIRES RESUBMIT |
| 09/14/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 09/14/2023 | REQUIRES RESUBMIT |
| 08/31/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 09/05/2023 | REQUIRES RESUBMIT |
| 09/18/2023 | RESTAMP - RESIDENTIAL v.1 | 09/19/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01471
Permit Status: Complete
Permit Description: Sunset West Model 1368
| Date | Description | Comments |
|---|---|---|
| 09/19/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 10/04/2023 | This project is within a floodplain and requires an elevation certificate. Submission and Issuance of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. | |
| 10/04/2023 | This project is within a floodplain and requires an elevation certificate. Submission and Issuance of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. | |
| 07/19/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/04/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01471
Permite Description: Sunset West Model 1368
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/07/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/07/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01471
Permit Description: Sunset West Model 1368
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2023 | COT - RSPL - Rough Soil | Passed | 10/5/23: ok to backfill | |
| 10/31/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/31/2023 | COT - RSBU - Preslab | Passed | ||
| 10/31/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 10/31/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/01/2023 | BULD - Electrical Clearance | Passed | Electrical rough-in is complete, electrical panels and meter boxes are attached to exterior wall. ECO electrical clearance issued to TEP Electric Power. | |
| 11/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall. | |
| 11/06/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 01/10/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 1/10/2024 | |
| 01/17/2024 | COT - RSPL - Sewer | Passed | ||
| 06/07/2024 | COT - RSEL - Electrical Final | Passed | ||
| 06/07/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 06/07/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/07/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/07/2024 | COT - RSME - Mechanical Final | Passed | ||
| 06/07/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 06/07/2024 | ENGR Engineering Final | Passed | Building & Plumbing finals in passed status, no Engineering deficiencies | |
| 06/07/2024 | RSBU - Building Final | Passed | ||
| 06/21/2024 | RSBU - Building Progress | Passed |