Permit: TC-MDP-0823-01468
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
5784 S BUG SPRINGS LP
Address NEW:
5784 S BUG SPRINGS LP
Apply Date:
08/23/2023
Applicant:
Andrea Flood
Description:
SFR F40F22 T22-M0026
Permit Reviews
Permit Number - TC-MDP-0823-01468
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01468
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 01/26/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 01/26/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 01/26/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 01/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 01/26/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 01/29/2024 | Post-Tension Inspection Report is required. |
| 01/29/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01468
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
| Date | Description | Comments |
|---|---|---|
| 08/01/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01468
Permite Description: SFR F40F22 T22-M0026
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 3/27/24: missing anchor bolts at shear walls. Missing rsp clips exterior. Missing stud at girder in kitchen area. |
| 04/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | |
| 04/25/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | |
| 04/25/2024 | COT - RSPL - Yard Water Line | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01468
Permit Description: SFR F40F22 T22-M0026
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2024 | COT - RSPL - Rough Soil | Passed | ||
| 02/26/2024 | COT - RSPL - Sewer | Passed | ||
| 03/07/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 03/07/2024 | COT - RSBU - Preslab | Passed | 3/7/24: passed. | |
| 03/07/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3/7/24: passed. | |
| 03/07/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 03/27/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 04/01/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4-1-24: Anchor bolts have been installed, RSP clip on exterior is installed, and missing stud under girder truss has been added. Okay to proceed with dry-in and stucco foam/lath installation. | |
| 04/25/2024 | BULD - Electrical Clearance | Passed | ||
| 04/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
| 04/26/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under an air pressure test, holding 15# of air pressure with no leaks. Okay to proceed. | |
| 05/08/2024 | COT - RSPL - Yard Water Line | Passed | 5/8/24: Main water line to house is connected to the City Water Main with a meter, and is under street pressure. Okay to shade pipe and backfill trench. | |
| 05/08/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly installed and secured to studs per plan requirements of 4" on the edge and 7" in the field. | |
| 07/16/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 08/07/2024 | COT - RSEL - Electrical Final | Passed | Mechanical, electrical, and plumbing fixtures are properly installed and functional. Electrical panel is properly labeled and GFCI/AFCI breakers are installed as required. Gas appliances are functioning correctly. Okay to issue Certificate of Occupancy for this permit. | |
| 08/07/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/07/2024 | COT - RSME - Mechanical Final | Passed | Mechanical, electrical, and plumbing fixtures are properly installed and functional. Electrical panel is properly labeled and GFCI/AFCI breakers are installed as required. Gas appliances are functioning correctly. Okay to issue Certificate of Occupancy for this permit. | |
| 08/07/2024 | COT - RSPL - Plumbing Final | Passed | Mechanical, electrical, and plumbing fixtures are properly installed and functional. Electrical panel is properly labeled and GFCI/AFCI breakers are installed as required. Gas appliances are functioning correctly. Okay to issue Certificate of Occupancy for this permit. | |
| 08/07/2024 | ENGR Engineering Final | Passed | Move in ready | |
| 08/07/2024 | RSBU - Building Final | Passed | Mechanical, electrical, and plumbing fixtures are properly installed and functional. Electrical panel is properly labeled and GFCI/AFCI breakers are installed as required. Gas appliances are functioning correctly. Okay to issue Certificate of Occupancy for this permit. | |
| 08/07/2024 | RSBU - Building Progress | Passed | Mechanical, electrical, and plumbing fixtures are properly installed and functional. Electrical panel is properly labeled and GFCI/AFCI breakers are installed as required. Gas appliances are functioning correctly. Okay to issue Certificate of Occupancy for this permit. |