Permit: TC-MDP-0823-01467
Permit Details
Apply Date:
12/22/2023
Applicant:
Paul Schmidt
Description:
SFR F40F22 T22-M0026
Permit Reviews
Permit Number - TC-MDP-0823-01467
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/22/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/28/2023 | APPROVED |
01/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01467
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
12/22/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
12/22/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
12/22/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
12/22/2023 | Post-Tension Inspection Report is required. |
12/22/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
12/22/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01467
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Date | Description | Comments |
---|---|---|
08/01/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01467
Permit Description: SFR F40F22 T22-M0026
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/01/2024 | COT - RSPL - Rough Soil | Passed | Cancelled per Matt Pavelich due to wet rainy day. | |
04/04/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/04/2024 | COT - RSPL - Sewer | Passed | ||
04/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on left side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab. | |
04/17/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on left side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab. | |
04/17/2024 | COT - RSEL - Electrical Underground | Passed | Electrical underground is complete for kitchen island. Okay to pour concrete. | |
04/17/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on left side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab. | |
05/03/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | All masa clips are properly secured to bottom plate. All j-bolts have a washer and nut tighten to bottom plate. Shear wall anchors are properly installed and secured to bottom plate. Straps are secured on large headers above doors and windows. Okay to proceed with other work. | |
05/03/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with H2.5 clips. Plywood sheathing is properly nailed to trusses per code. All rat runs and cross bracing is installed per truss calcs. Okay to proceed with top out of plumbing. | |
06/06/2024 | BULD - Electrical Clearance | Passed | TEP eco | |
06/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/06/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
06/28/2024 | COT - RSBU - Interior Shear Bracing | Passed | 6/28/24: Shower in Master Bedroom is complete. Okay to proceed with tape, texture, and paint. | |
08/06/2024 | COT - BULD - SWG Clearance | Passed | SWG FOR METER ONLY | |
09/09/2024 | COT - RSEL - Electrical Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | COT - RSEL - Outdoor Lighting | Passed | 9/9/24: Outdoor lighting is properly installed per plans and City regulations and fully operational. | |
09/09/2024 | COT - RSME - Mechanical Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | COT - RSPL - Plumbing Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | ENGR Engineering Final | Passed | Pull the nursery stakes, I will be looking for this on every inspection. | |
09/09/2024 | RSBU - Building Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | RSBU - Building Progress | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. |