Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/22/2023
Applicant:
Paul Schmidt
Description:
SFR F40F22 T22-M0026

Permit Reviews

Permit Number - TC-MDP-0823-01467
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Start Date Submittal Complete Date Status  
12/22/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/28/2023 APPROVED Review Details
01/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01467
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Total Outstanding Activity Conditions - 6
Date Name
12/22/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/22/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/22/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/22/2023 Post-Tension Inspection Report is required.
12/22/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/22/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0823-01467
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Date Description Comments
08/01/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01467
Permit Description: SFR F40F22 T22-M0026
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/01/2024 COT - RSPL - Rough Soil Passed Cancelled per Matt Pavelich due to wet rainy day.
04/04/2024 COT - RSPL - Yard Water Line Passed
04/04/2024 COT - RSPL - Sewer Passed
04/17/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on left side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab.
04/17/2024 COT - RSBU - Preslab Passed Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on left side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab.
04/17/2024 COT - RSEL - Electrical Underground Passed Electrical underground is complete for kitchen island. Okay to pour concrete.
04/17/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set in place, post tension cabling is properly installed, rebar reinforcement is in place per plans, UFER Ground is in place on left side of garage, and all footings are free of debris. Okay to pour concrete for footings and concrete slab.
05/03/2024 COT - RSBU - Exterior Clips/Sheathing Passed All masa clips are properly secured to bottom plate. All j-bolts have a washer and nut tighten to bottom plate. Shear wall anchors are properly installed and secured to bottom plate. Straps are secured on large headers above doors and windows. Okay to proceed with other work.
05/03/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with H2.5 clips. Plywood sheathing is properly nailed to trusses per code. All rat runs and cross bracing is installed per truss calcs. Okay to proceed with top out of plumbing.
06/06/2024 BULD - Electrical Clearance Passed TEP eco
06/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/06/2024 COT - RSPL - Gas Pressure Test Passed
06/28/2024 COT - RSBU - Interior Shear Bracing Passed 6/28/24: Shower in Master Bedroom is complete. Okay to proceed with tape, texture, and paint.
08/06/2024 COT - BULD - SWG Clearance Passed SWG FOR METER ONLY
09/09/2024 COT - RSEL - Electrical Final Passed 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy.
09/09/2024 COT - RSEL - Outdoor Lighting Passed 9/9/24: Outdoor lighting is properly installed per plans and City regulations and fully operational.
09/09/2024 COT - RSME - Mechanical Final Passed 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy.
09/09/2024 COT - RSPL - Plumbing Final Passed 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy.
09/09/2024 ENGR Engineering Final Passed Pull the nursery stakes, I will be looking for this on every inspection.
09/09/2024 RSBU - Building Final Passed 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy.
09/09/2024 RSBU - Building Progress Passed 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
3_SITEPLAN- UPDATED_V1.PDF DOCUMENTS VIEW
STIV 368 - REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-12-22_V1.PDF DOCUMENTS VIEW