Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01465
Permit Details
Apply Date:
08/31/2023
Applicant:
Paul Schmidt
Description:
SFR F40F22 T22-M0026
Permit Reviews
Permit Number - TC-MDP-0823-01465
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/31/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/05/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01465
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
08/31/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
08/31/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/31/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/31/2023 | Post-Tension Inspection Report is required. |
08/31/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
08/31/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01465
Permit Status: Inspections complete
Permit Description: SFR F40F22 T22-M0026
Date | Description | Comments |
---|---|---|
08/01/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01465
Permit Description: SFR F40F22 T22-M0026
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/12/2024 | COT - RSPL - Backwater Valve | Passed | ||
03/12/2024 | COT - RSPL - Rough Soil | Passed | ||
03/18/2024 | COT - RSPL - Sewer | Passed | Sewer line is connected to city sewer system and under pressure test with no leaks in pipes. Okay to shade pipe and backfill trench. | |
03/18/2024 | COT - RSPL - Yard Water Line | Passed | Main water line is connected to City water supply with a meter and under street pressure. Blue tracer wire is installed. Okay to shade pipe and backfill trench. | |
03/20/2024 | COT - RSEL - Electrical Underground | Passed | ||
03/20/2024 | COT - RSBU - Preslab | Passed | ||
03/20/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
03/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/16/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/16/2024 | COT - RSBU - Roof Nailing | Passed | ||
05/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/07/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
05/07/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
05/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/11/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
08/26/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with the proper AFCI & GFCI breakers installed. Outdoor lighting is installed per plan and city guidelines. Okay to issue Certificate of Occupancy. | |
08/26/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with the proper AFCI & GFCI breakers installed. Outdoor lighting is installed per plan and city guidelines. Okay to issue Certificate of Occupancy. | |
08/26/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with the proper AFCI & GFCI breakers installed. Outdoor lighting is installed per plan and city guidelines. Okay to issue Certificate of Occupancy. | |
08/26/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with the proper AFCI & GFCI breakers installed. Outdoor lighting is installed per plan and city guidelines. Okay to issue Certificate of Occupancy. | |
08/26/2024 | ENGR Engineering Final | Passed | Move in ready | |
08/26/2024 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with the proper AFCI & GFCI breakers installed. Outdoor lighting is installed per plan and city guidelines. Okay to issue Certificate of Occupancy. | |
08/26/2024 | RSBU - Building Progress | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with the proper AFCI & GFCI breakers installed. Outdoor lighting is installed per plan and city guidelines. Okay to issue Certificate of Occupancy. |