Permit: TC-MDP-0823-01463
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
12711 E LAUREN CANYON PL
Address NEW:
12711 E LAUREN CANYON PL
Apply Date:
08/23/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKM45X T21-M0094 REVISION-Structural change
Permit Reviews
Permit Number - TC-MDP-0823-01463
Permit Status: Inspections
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/24/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/28/2023 | APPROVED |
| 04/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/09/2024 | APPROVED |
| 09/26/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01463
Permit Status: Inspections
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/11/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 04/11/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 04/11/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 04/11/2024 | Post-Tension Inspection Report is required. |
| 04/11/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0823-01463
Permit Status: Inspections
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
| Date | Description | Comments |
|---|---|---|
| 09/27/2023 | ISSUED WITH PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P21SD0033 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ | |
| 08/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/28/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0823-01463
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 02/21/2024 | COT - RSPL - Rough Soil | Passed | ||
| 02/21/2024 | COT - RSPL - Sewer | Passed | ||
| 02/21/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 03/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/05/2024 | COT - RSBU - Preslab | Passed | ||
| 03/05/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 03/05/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 03/22/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | H2.5 clips are installed on all rafters of 2nd floor and roof. Shear wall sheathing is properly installed and nailed off. | |
| 03/22/2024 | COT - RSBU - Roof Nailing | Passed | Roof sheathing is properly nailed off. | |
| 04/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
| 04/29/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# of air pressure and holding. Okay to proceed. | |
| 05/02/2024 | BULD - Electrical Clearance | Passed | 5/2/24 - CLEAR ECO | |
| 05/14/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/03/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed at location of gas appliances in kitchen, laundry, attic, and garage. Okay to install meter. SWG Clearance issued to Southwest Gas Company. | |
| 07/19/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/19/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 07/30/2024 | ENGR Engineering Final | Passed | Remove the nursery stakes from the trees and again cut the clean outs down to grade. | |
| 07/30/2024 | COT - RSME - Mechanical Final | Passed | ||
| 07/30/2024 | COT - RSEL - Electrical Final | Passed | ||
| 08/02/2024 | RSBU - Building Final | Passed | 8/2/24: clean outs have been cut to grade. Post tension tag has been installed on hose bib in front of house. All other work is completed. Okay to issue Certificate of Occupancy once all other agencies have completed and approved their inspections. |