Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/31/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55F T21-M0087

Permit Reviews

Permit Number - TC-MDP-0823-01456
Permit Status: Inspections complete
Permit Description: SFR RKF55F T21-M0087
Start Date Submittal Complete Date Status  
09/01/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/05/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01456
Permit Status: Inspections complete
Permit Description: SFR RKF55F T21-M0087
Total Outstanding Activity Conditions - 6
Date Name
01/20/2023 Post-Tension Inspection Report is required.
01/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/01/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/01/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/01/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/01/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0823-01456
Permit Status: Inspections complete
Permit Description: SFR RKF55F T21-M0087
Date Description Comments
08/23/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01456
Permit Description: SFR RKF55F T21-M0087
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/01/2023 COT - RSPL - Rough Soil Passed
11/01/2023 COT - RSPL - Sewer Passed
11/14/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/14/2023 COT - RSBU - Preslab Passed
11/14/2023 COT - RSEL - Electrical Underground Passed
11/14/2023 COT - RSEL - Grounding/Bonding Passed
12/07/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/07/2023 COT - RSBU - Roof Nailing Passed
01/23/2024 BULD - Electrical Clearance Passed TEP eco
01/23/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/23/2024 COT - RSPL - Gas Pressure Test Passed
01/23/2024 COT - RSPL - Yard Water Line Passed
02/09/2024 COT - RSBU - Interior Shear Bracing Passed
04/05/2024 COT - BULD - SWG Clearance Passed All gas appliance locations have shut off valves and gas flex lines attached to gas piping. Okay to proceed with installation of gas meter.
04/05/2024 RSBU - Building Progress Passed All gas appliance locations have shut off valves and gas flex lines attached to gas piping. Okay to proceed with installation of gas meter.
04/23/2024 COT - RSEL - Electrical Final Passed
04/23/2024 COT - RSEL - Outdoor Lighting Passed
04/23/2024 COT - RSME - Mechanical Final Passed
04/23/2024 COT - RSPL - Plumbing Final Passed
04/23/2024 RSBU - Building Final Passed
04/23/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-31_V1.PDF DOCUMENTS VIEW