Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9907 S DIANE RANCH RD
Apply Date:
09/25/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4)

Permit Reviews

Permit Number - TC-MDP-0823-01451
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Start Date Submittal Complete Date Status  
09/25/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/28/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01451
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Activity Conditions - 6
Date Name
09/25/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/25/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/25/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/25/2023 Post-Tension Inspection Report is required.
09/25/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/25/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0823-01451
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Date Description Comments
10/02/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
08/23/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01451
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/14/2023 COT - RSPL - Rough Soil Passed
11/14/2023 COT - RSPL - Sewer Passed
11/14/2023 COT - RSPL - Yard Water Line Passed
11/21/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/21/2023 COT - RSBU - Preslab Passed
11/21/2023 COT - RSEL - Electrical Underground Passed
11/21/2023 COT - RSEL - Grounding/Bonding Passed
12/18/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/18/2023 COT - RSBU - Roof Nailing Passed
01/30/2024 BULD - Electrical Clearance Passed TEP ECO
01/30/2024 COT - RSPL - Gas Pressure Test Passed
01/31/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/12/2024 COT - RSBU - Interior Shear Bracing Passed
04/11/2024 COT - BULD - SWG Clearance Passed SWG for meter only
05/01/2024 ENGR Engineering Final Passed
05/01/2024 RSBU - Building Progress Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI receptacles are installed in bathrooms, kitchen, laundry room, and garage. AFCI Breakers are installed for the rest of house. All supply and return air registers are installed. All smoke detectors are installed and operational.
05/01/2024 RSBU - Building Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI receptacles are installed in bathrooms, kitchen, laundry room, and garage. AFCI Breakers are installed for the rest of house. All supply and return air registers are installed. All smoke detectors are installed and operational.
05/01/2024 COT - RSPL - Plumbing Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI receptacles are installed in bathrooms, kitchen, laundry room, and garage. AFCI Breakers are installed for the rest of house. All supply and return air registers are installed. All smoke detectors are installed and operational.
05/01/2024 COT - RSME - Mechanical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI receptacles are installed in bathrooms, kitchen, laundry room, and garage. AFCI Breakers are installed for the rest of house. All supply and return air registers are installed. All smoke detectors are installed and operational.
05/01/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed per plans and fully operational.
05/01/2024 COT - RSEL - Electrical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI receptacles are installed in bathrooms, kitchen, laundry room, and garage. AFCI Breakers are installed for the rest of house. All supply and return air registers are installed. All smoke detectors are installed and operational.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-09-25_V1.PDF DOCUMENTS VIEW