Permit: TC-MDP-0823-01429
Permit Details
Apply Date:
08/18/2023
Applicant:
Vance Goodman
Description:
2231 Sleepy Hollow Estates
Permit Reviews
Permit Number - TC-MDP-0823-01429
Permit Status: Issued
Permit Description: 2231 Sleepy Hollow Estates
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/24/2024 | APPROVED |
09/06/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 09/07/2023 | APPROVED |
08/31/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/31/2023 | REQUIRES RESUBMIT |
09/07/2023 | RESTAMP - RESIDENTIAL v.1 | 09/07/2023 | APPROVED |
08/18/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/25/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01429
Permit Status: Issued
Permit Description: 2231 Sleepy Hollow Estates
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
05/17/2023 | Post-Installed Anchor Inspection Report is required. |
05/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
08/18/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0823-01429
Permit Status: Issued
Permit Description: 2231 Sleepy Hollow Estates
Date | Description | Comments |
---|---|---|
05/17/2023 | Post-Tension Inspection Report is required. | |
05/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0823-01429
Permite Description: 2231 Sleepy Hollow Estates
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/14/2024 | COT - RSEL - Electrical Underground | N/A | Partial Pass | Secondaries from transformer to service panel approved. Okay to backfill progress areas. 6/14/2024 |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0823-01429
Permit Description: 2231 Sleepy Hollow Estates
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/15/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 2/15/2024 | |
03/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Okay for concrete placement. 3/5/2024 | |
03/05/2024 | COT - RSBU - Preslab | Passed | ||
03/05/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
04/22/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/22/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. Received letter from engineer stating structural column is acceptable per structural detail 23/S1.5. 6/14/2024 | |
07/08/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/01/2024 | COT - RSPL - Sewer | Passed | ||
08/01/2024 | COT - RSPL - Yard Water Line | Passed | ||
10/11/2024 | COT - RSEL - Electrical Underground | Passed | ||
10/18/2024 | BULD - Electrical Clearance | Passed |