Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/18/2023
Applicant:
Description:
2506 Sleepy Hollow Estates

Permit Reviews

Permit Number - TC-MDP-0823-01420
Permit Status: Complete
Permit Description: 2506 Sleepy Hollow Estates
Start Date Submittal Complete Date Status  
08/28/2023 SITE FROM MODEL PERMIT - PRODUCTION v.2 08/28/2023 REQUIRES RESUBMIT Review Details
01/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/24/2024 APPROVED Review Details
08/31/2023 SITE FROM MODEL PERMIT - PRODUCTION v.3 08/31/2023 APPROVED Review Details
06/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/16/2025 APPROVED Review Details
01/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/31/2025 REQUIRES RESUBMIT Review Details
08/19/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/23/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0823-01420
Permit Status: Complete
Permit Description: 2506 Sleepy Hollow Estates
Date Description Comments
01/27/2025 Post-Installed Anchor Inspection Report is required.
05/17/2023 Post-Installed Anchor Inspection Report is required.
05/17/2023 Post-Tension Inspection Report is required.
05/17/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/27/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/27/2025 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/27/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
05/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01420
Permite Description: 2506 Sleepy Hollow Estates
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
12/16/2024 COT - BULD - SWG Clearance N/A Not Applicable
12/16/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
12/31/2024 COT - RSEL - Outdoor Lighting N/A Not Ready
12/31/2024 COT - RSEL - Electrical Final N/A Not Ready
12/31/2024 COT - RSME - Mechanical Final N/A Not Ready
12/31/2024 COT - RSPL - Plumbing Final N/A Not Ready
01/23/2025 ENGR Engineering Final N/A Partial Pass Okay for Level 4 TCO
Contractor needs to repair all the damage curb and sidewalks

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01420
Permit Description: 2506 Sleepy Hollow Estates
Total Completed Inspections - 19
Date Description Inspector Results Comments
03/21/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 3/21/2024
04/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar per plan. Okay for concrete placement. 4/5/2024
04/05/2024 COT - RSBU - Preslab Passed
04/05/2024 COT - RSEL - Grounding/Bonding Passed
05/21/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/21/2024 COT - RSBU - Roof Nailing Passed
08/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/25/2024 COT - RSBU - Interior Shear Bracing Passed
10/11/2024 BULD - Electrical Clearance Passed 10/11/24: TEP ECO CLEARANCE FOR 615 W ALTURAS ST BLDG 8 UNITS 8101 and unit 8102
11/06/2024 COT - RSPL - Sewer Passed
11/06/2024 COT - RSPL - Yard Water Line Passed
12/16/2024 COT - RSEL - Electrical Underground Passed
12/16/2024 RSBU - Building Progress Passed
01/07/2025 COT - RSEL - Outdoor Lighting Passed
01/09/2025 COT - RSEL - Electrical Final Passed
01/15/2025 COT - RSME - Mechanical Final Passed
01/15/2025 COT - RSPL - Plumbing Final Passed
01/22/2025 RSBU - Building Final Passed
06/12/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
POST INSTALLED ANCHORS_23-094M SLEEPY HOLLOW ALL PADS-2025-06-13_V2.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RESPONSE LETTER TC-MDP-0823-01420 BLDG. 8 615 W. ALTURAS ST_V1.PDF DOCUMENTS VIEW
SLEEPY HOLLOW REFERENCE_DP SHEETS BLDG 8_V1.PDF DOCUMENTS VIEW
SLEEPY HOLLOW SITE UTILITY BLDG 8_V2.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE SLEEPY HOLLOW ESTATES 2506 BLDG 8 8.15.23-2023-08-18_V1.PDF DOCUMENTS VIEW