Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
08/18/2023
Applicant:
Description:
2800 Sleepy Hollow Estates

Permit Reviews

Permit Number - TC-MDP-0823-01419
Permit Status: Issued
Permit Description: 2800 Sleepy Hollow Estates
Start Date Submittal Complete Date Status  
08/28/2023 SITE FROM MODEL PERMIT - PRODUCTION v.2 08/28/2023 REQUIRES RESUBMIT Review Details
09/05/2023 RESTAMP - RESIDENTIAL v.1 09/05/2023 APPROVED Review Details
08/19/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/23/2023 REQUIRES RESUBMIT Review Details
08/31/2023 RESTAMP - RESIDENTIAL v.1 09/05/2023 APPROVED Review Details
01/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/24/2024 APPROVED Review Details
08/31/2023 SITE FROM MODEL PERMIT - PRODUCTION v.3 08/31/2023 APPROVED Review Details
12/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/27/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01419
Permit Status: Issued
Permit Description: 2800 Sleepy Hollow Estates
Total Outstanding Activity Conditions - 6
Date Name
05/17/2023 Post-Installed Anchor Inspection Report is required.
05/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/31/2024 Post-Installed Anchor Inspection Report is required.
12/31/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/31/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0823-01419
Permit Status: Issued
Permit Description: 2800 Sleepy Hollow Estates
Date Description Comments
05/17/2023 Post-Tension Inspection Report is required.
05/17/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/31/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0823-01419
Permite Description: 2800 Sleepy Hollow Estates
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/13/2024 COT - BULD - SWG Clearance N/A Not Applicable
12/13/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
12/27/2024 ENGR Engineering Final N/A Partial Pass Okay for TCO level 4

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0823-01419
Permit Description: 2800 Sleepy Hollow Estates
Total Completed Inspections - 18
Date Description Inspector Results Comments
02/12/2024 COT - RSPL - Rough Soil Passed Okay to backfill shading required. 2/12/2024
02/27/2024 COT - RSBU - Preslab Passed
02/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/27/2024 COT - RSEL - Grounding/Bonding Passed
04/08/2024 COT - RSBU - Exterior Clips/Sheathing Passed
04/08/2024 COT - RSBU - Roof Nailing Passed
06/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/16/2024 COT - RSBU - Interior Shear Bracing Passed
07/29/2024 COT - RSPL - Sewer Passed
08/01/2024 COT - RSEL - Electrical Underground Passed
08/01/2024 COT - RSPL - Yard Water Line Passed
10/18/2024 BULD - Electrical Clearance Passed
12/13/2024 RSBU - Building Progress Passed
12/20/2024 COT - RSEL - Electrical Final Passed
12/20/2024 COT - RSEL - Outdoor Lighting Passed
12/20/2024 COT - RSME - Mechanical Final Passed
12/20/2024 COT - RSPL - Plumbing Final Passed
12/23/2024 RSBU - Building Final Passed 12/23/24. Passed, ok for level four TCO for DP.

Documents

File Name Document Type  
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
23-094M SLEEPY HOLLOW 19 SP IN FIN-2024-12-25_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SLEEPY HOLLOW REFERENCE_DP SHEETS BLDG 19_V3.PDF DOCUMENTS VIEW