Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01417
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
615 W ALTURAS ST BLDG 11
Address NEW:
615 W ALTURAS ST BLDG 11
Apply Date:
08/18/2023
Applicant:
Description:
2800 Sleepy Hollow Estates
Permit Reviews
Permit Number - TC-MDP-0823-01417
Permit Status: Complete
Permit Description: 2800 Sleepy Hollow Estates
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2025 | APPROVED |
| 01/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/24/2024 | APPROVED |
| 08/28/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/28/2023 | REQUIRES RESUBMIT |
| 08/19/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/23/2023 | REQUIRES RESUBMIT |
| 08/31/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 08/31/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01417
Permit Status: Complete
Permit Description: 2800 Sleepy Hollow Estates
| Date | Description | Comments |
|---|---|---|
| 05/17/2023 | Post-Installed Anchor Inspection Report is required. | |
| 05/17/2023 | Post-Tension Inspection Report is required. | |
| 05/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/19/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01417
Permite Description: 2800 Sleepy Hollow Estates
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 12-24-24, not applicable. |
| 12/24/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | 12-24-24, not applicable. |
| 12/24/2024 | COT - RSBU - Interior Shear Bracing | N/A | Partial Pass | 12-24-24, per contractor no shear walls for interior units. Units for bldg 11 were already taped & textured. Contractor will upload an architectural letter to city website for review. |
| 06/21/2024 | COT - RSEL - Electrical Underground | N/A | Partial Pass | Secondaries from building to new transformer location. Okay to backfill. Shading required. 6/21/2024 |
| 01/29/2025 | ENGR Engineering Final | N/A | Partial Pass | Okay for Level 4 TCO Contractor needs to move the fence and the Connex so we can get through |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01417
Permit Description: 2800 Sleepy Hollow Estates
Total Completed Inspections - 18