Permit: TC-MDP-0823-01415
Permit Details
Apply Date:
08/18/2023
Applicant:
Vance Goodman
Description:
1894 Sleepy Hollow
Permit Reviews
Permit Number - TC-MDP-0823-01415
Permit Status: Issued
Permit Description: 1894 Sleepy Hollow
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/24/2024 | APPROVED |
08/19/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/23/2023 | REQUIRES RESUBMIT |
09/05/2023 | RESTAMP - RESIDENTIAL v.1 | 09/05/2023 | APPROVED |
08/31/2023 | RESTAMP - RESIDENTIAL v.1 | 09/05/2023 | APPROVED |
08/31/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 08/31/2023 | APPROVED |
08/28/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/28/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01415
Permit Status: Issued
Permit Description: 1894 Sleepy Hollow
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
01/24/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
05/17/2023 | Post-Installed Anchor Inspection Report is required. |
05/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
08/19/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0823-01415
Permit Status: Issued
Permit Description: 1894 Sleepy Hollow
Date | Description | Comments |
---|---|---|
05/17/2023 | Post-Tension Inspection Report is required. | |
04/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0823-01415
Permite Description: 1894 Sleepy Hollow
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2024 | COT - RSEL - Electrical Underground | N/A | Partial Pass | |
COT - RSBU - Interior Shear Bracing | N/A | Scheduled | ||
COT - BULD - SWG Clearance | N/A | Scheduled | ||
COT - RSPL - Gas Pressure Test | N/A | Scheduled |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0823-01415
Permit Description: 1894 Sleepy Hollow
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/09/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 4/9/2024 | |
04/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/19/2024 | COT - RSBU - Preslab | Passed | ||
04/19/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/07/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
10/11/2024 | BULD - Electrical Clearance | Passed | 10/11/24: TEP ECO CLEARANCE FOR 615 W ALTURAS ST BLDG 9 UNITS 9101 and unit 9102 | |
11/13/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 11/13/2024 | |
11/13/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 11/13/2024 |
Scheduled Inspections
Scheduled Inspections - TC-MDP-0823-01415
Status: Issued
Description: 1894 Sleepy Hollow
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
12/23/2024 | COT - RSBU - Interior Shear Bracing | Scheduled | |
12/23/2024 | COT - RSPL - Gas Pressure Test | Scheduled | |
12/23/2024 | COT - BULD - SWG Clearance | Scheduled |