Permit: TC-MDP-0823-01413
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
615 W ALTURAS ST BLDG 4
Address NEW:
615 W ALTURAS ST BLDG 4
Apply Date:
08/18/2023
Applicant:
Description:
1567 Sleepy Hollow Estates
Permit Reviews
Permit Number - TC-MDP-0823-01413
Permit Status: Complete
Permit Description: 1567 Sleepy Hollow Estates
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/31/2023 | RESTAMP - RESIDENTIAL v.1 | 09/05/2023 | APPROVED |
| 08/28/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/28/2023 | REQUIRES RESUBMIT |
| 08/31/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 08/31/2023 | APPROVED |
| 09/05/2023 | RESTAMP - RESIDENTIAL v.1 | 09/05/2023 | APPROVED |
| 03/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/27/2025 | APPROVED |
| 01/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/24/2024 | APPROVED |
| 08/19/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/23/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0823-01413
Permit Status: Complete
Permit Description: 1567 Sleepy Hollow Estates
| Date | Description | Comments |
|---|---|---|
| 05/15/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/23/2025 | Post-Installed Anchor Inspection Report is required. | |
| 05/15/2023 | Post-Installed Anchor Inspection Report is required. | |
| 01/23/2025 | Post-Tension Inspection Report is required. | |
| 05/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/23/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 01/23/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 05/15/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01413
Permite Description: 1567 Sleepy Hollow Estates
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | |
| 01/22/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 01/22/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | |
| 01/22/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 03/25/2025 | COT - FCON - Sprinkler - Final | N/A | Not Ready | Sprinkler contractor needs to call in their permit. |
| 03/27/2025 | ENGR Engineering Final | N/A | Partial Pass | Buildings good for a level fourTCO |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01413
Permit Description: 1567 Sleepy Hollow Estates
Total Completed Inspections - 20