Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
08/18/2023
Applicant:
Vance Goodman
Description:
1567 Sleepy Hollow Estates

Permit Reviews

Permit Number - TC-MDP-0823-01412
Permit Status: Issued
Permit Description: 1567 Sleepy Hollow Estates
Start Date Submittal Complete Date Status  
08/19/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/23/2023 REQUIRES RESUBMIT Review Details
08/31/2023 SITE FROM MODEL PERMIT - PRODUCTION v.3 08/31/2023 APPROVED Review Details
08/31/2023 RESTAMP - RESIDENTIAL v.1 09/01/2023 APPROVED Review Details
08/25/2023 SITE FROM MODEL PERMIT - PRODUCTION v.2 08/25/2023 REQUIRES RESUBMIT Review Details
01/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/31/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01412
Permit Status: Issued
Permit Description: 1567 Sleepy Hollow Estates
Total Outstanding Activity Conditions - 3
Date Name
05/15/2023 Post-Installed Anchor Inspection Report is required.
05/15/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0823-01412
Permit Status: Issued
Permit Description: 1567 Sleepy Hollow Estates
Date Description Comments
05/15/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/17/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0823-01412
Permit Description: 1567 Sleepy Hollow Estates
Total Completed Inspections - 11
Date Description Inspector Results Comments
05/06/2024 COT - RSPL - Rough Soil Passed
05/16/2024 COT - RSBU - Preslab Passed
05/16/2024 COT - RSEL - Grounding/Bonding Passed
05/16/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/01/2024 COT - RSEL - Electrical Underground Passed
08/07/2024 COT - RSBU - Exterior Clips/Sheathing Passed
09/11/2024 COT - RSPL - Yard Water Line Passed
09/17/2024 COT - RSPL - Sewer Passed
09/17/2024 COT - RSBU - Roof Nailing Passed
10/11/2024 BULD - Electrical Clearance Passed 10/11/24: ECO TEP VERBAL CLEARANCE for 615 W ALTURAS ST BLDG 2 UNITS 2101 and 2102.
11/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed

Documents

File Name Document Type  
SLEEPY HOLLOW REFERENCE_DP SHEETS BLDG 2_V1.PDF DOCUMENTS VIEW
SLEEPY HOLLOW SITE UTILITY BLDG 2_V1.PDF DOCUMENTS VIEW