Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
08/18/2023
Applicant:
Vance Goodman
Description:
1567 Sleepy Hollow Estates

Permit Reviews

Permit Number - TC-MDP-0823-01411
Permit Status: Issued
Permit Description: 1567 Sleepy Hollow Estates
Start Date Submittal Complete Date Status  
08/31/2023 SITE FROM MODEL PERMIT - PRODUCTION v.3 08/31/2023 APPROVED Review Details
01/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/24/2024 APPROVED Review Details
08/25/2023 SITE FROM MODEL PERMIT - PRODUCTION v.2 08/25/2023 REQUIRES RESUBMIT Review Details
08/19/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/23/2023 REQUIRES RESUBMIT Review Details
08/31/2023 RESTAMP - RESIDENTIAL v.1 09/01/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01411
Permit Status: Issued
Permit Description: 1567 Sleepy Hollow Estates
Total Outstanding Activity Conditions - 4
Date Name
01/24/2024 Post-Tension Inspection Report is required.
05/15/2023 Post-Installed Anchor Inspection Report is required.
05/15/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0823-01411
Permit Status: Issued
Permit Description: 1567 Sleepy Hollow Estates
Date Description Comments
05/15/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/17/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0823-01411
Permite Description: 1567 Sleepy Hollow Estates
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/31/2024 COT - RSEL - Electrical Underground N/A Partial Pass Secondaries from transformers to panel approved. 5/31/2024

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0823-01411
Permit Description: 1567 Sleepy Hollow Estates
Total Completed Inspections - 11
Date Description Inspector Results Comments
02/23/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 2/23/2024
03/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/15/2024 COT - RSBU - Preslab Passed
03/15/2024 COT - RSEL - Grounding/Bonding Passed
05/23/2024 COT - RSBU - Roof Nailing Passed
05/31/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/23/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/14/2024 COT - RSBU - Interior Shear Bracing Passed
09/11/2024 COT - RSPL - Yard Water Line Passed
09/17/2024 COT - RSPL - Sewer Passed
10/11/2024 BULD - Electrical Clearance Passed 10/11/24: TEP ECO CLEARANCE FOR 615 W ALTURAS ST BLDG 14 UNITS 14101 and unit 14102

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SLEEPY HOLLOW REFERENCE_DP SHEETS BLDG 14_V1.PDF DOCUMENTS VIEW
SLEEPY HOLLOW SITE UTILTIY BLDG 14_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER TC-MDP-0823-01411 BLDG. 14 615 W. ALTURAS ST_V1.PDF DOCUMENTS VIEW
SLEEPY HOLLOW SITE UTILTIY BLDG 14_V1.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE SLEEPY HOLLOW ESTATES 1567 BLDG 14 8.15.23-2023-08-25_V2.PDF DOCUMENTS VIEW