Permit: TC-MDP-0823-01409
Permit Details
Apply Date:
08/18/2023
Applicant:
Description:
1567 Sleepy Hollow Estates
Permit Reviews
Permit Number - TC-MDP-0823-01409
Permit Status: Issued
Permit Description: 1567 Sleepy Hollow Estates
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/31/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 08/31/2023 | APPROVED |
08/19/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/23/2023 | REQUIRES RESUBMIT |
08/25/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/25/2023 | REQUIRES RESUBMIT |
01/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/24/2024 | APPROVED |
12/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/27/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01409
Permit Status: Issued
Permit Description: 1567 Sleepy Hollow Estates
Date | Description | Comments |
---|---|---|
05/15/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
12/31/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/15/2023 | Post-Installed Anchor Inspection Report is required. | |
12/31/2024 | Post-Installed Anchor Inspection Report is required. | |
01/24/2024 | Post-Tension Inspection Report is required. | |
12/31/2024 | Post-Tension Inspection Report is required. | |
05/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/31/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
08/19/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
12/31/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
05/15/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
12/31/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0823-01409
Permite Description: 1567 Sleepy Hollow Estates
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/14/2024 | COT - RSEL - Electrical Underground | N/A | Partial Pass | Secondaries from transformer to service panel approved. Okay to backfill progress areas. 6/14/2024 |
12/13/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
12/13/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
12/27/2024 | ENGR Engineering Final | N/A | Partial Pass | Okay for TCO level 4 |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0823-01409
Permit Description: 1567 Sleepy Hollow Estates
Total Completed Inspections - 19