Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/23/2023
Applicant:
Andrea Flood
Description:
SFR F60B22 T22-M0027

Permit Reviews

Permit Number - TC-MDP-0823-01406
Permit Status: Inspections complete
Permit Description: SFR F60B22 T22-M0027
Start Date Submittal Complete Date Status  
08/24/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/29/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01406
Permit Status: Inspections complete
Permit Description: SFR F60B22 T22-M0027
Total Outstanding Activity Conditions - 6
Date Name
08/24/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/24/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/24/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/24/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/28/2023 Post-Tension Inspection Report is required.
08/28/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0823-01406
Permit Status: Inspections complete
Permit Description: SFR F60B22 T22-M0027
Date Description Comments
08/16/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01406
Permit Description: SFR F60B22 T22-M0027
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/03/2023 COT - RSPL - Backwater Valve Passed
10/03/2023 COT - RSPL - Rough Soil Passed
10/03/2023 COT - RSPL - Sewer Passed
10/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/06/2023 COT - RSBU - Preslab Passed
10/06/2023 COT - RSEL - Electrical Underground Passed
10/06/2023 COT - RSEL - Grounding/Bonding Passed
11/02/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/02/2023 COT - RSBU - Roof Nailing Passed
11/28/2023 COT - RSPL - Yard Water Line Passed
11/28/2023 BULD - Electrical Clearance Passed TEP ECO
11/30/2023 COT - RSPL - Gas Pressure Test Passed
12/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/15/2023 COT - RSBU - Interior Shear Bracing Passed
02/14/2024 COT - RSME - Mechanical Final Passed
02/14/2024 COT - BULD - SWG Clearance Passed SWG for meter only
03/06/2024 COT - RSEL - Electrical Final Passed
03/06/2024 COT - RSEL - Outdoor Lighting Passed
03/06/2024 COT - RSPL - Plumbing Final Passed
03/06/2024 RSBU - Building Progress Passed
03/08/2024 RSBU - Building Final Passed 3/8/24: Construction of new home is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is per plans. Engineering inspection is scheduled for today,but has not been recorded as of yet. Okay to issue Certificate of Occupancy once engineering inspection has been completed and approved.
03/08/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-23_V1.PDF DOCUMENTS VIEW