Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01405
Permit Details
Apply Date:
10/10/2023
Applicant:
Andrea Flood
Description:
SFR F40G22 T22-M0025 Revision-Truss Calcs
Permit Reviews
Permit Number - TC-MDP-0823-01405
Permit Status: Issued
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/11/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/17/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01405
Permit Status: Issued
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
10/11/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
10/11/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
10/11/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
10/11/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0823-01405
Permit Status: Issued
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Date | Description | Comments |
---|---|---|
07/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/16/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/20/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0823-01405
Permite Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/30/2023 | COT - RSPL - Rough Soil | N/A | Re-inspection required | 11/30/23: remove all rocks and clods under pipe and place approved bedding material. |
11/30/2023 | COT - RSPL - Sewer | N/A | Re-inspection required | 11/30/23: remove all rocks and clods under pipe and place approved bedding material. |
12/08/2023 | COT - RSPL - Yard Water Line | N/A | Not Ready | 12/8/23: not under pressure. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0823-01405
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Completed Inspections - 18
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/08/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
12/08/2023 | COT - RSBU - Preslab | Passed | ||
12/08/2023 | COT - RSEL - Electrical Underground | Passed | ||
12/08/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
01/05/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | All h2.5 clips are properly installed and nailed. All exterior shear walls are properly secured to studs per plan details. Bolts and base plate clips are installed and properly secured to sole plate. | |
01/05/2024 | COT - RSBU - Roof Nailing | Passed | All h2.5 clips are properly installed and nailed. All exterior shear walls are properly secured to studs per plan details. Bolts and base plate clips are installed and properly secured to sole plate. Plywood roof sheathing is installed properly and nailed off. | |
02/21/2024 | BULD - Electrical Clearance | Passed | TEP eco | |
02/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/04/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
05/01/2024 | COT - BULD - SWG Clearance | Passed | Gas line is under pressure test and holding. SWG Clearance issued. | |
05/01/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is holding 15# of air. Okay to proceed. | |
05/15/2024 | COT - RSEL - Electrical Final | Passed | ||
05/15/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
05/15/2024 | COT - RSME - Mechanical Final | Passed | ||
05/15/2024 | COT - RSPL - Plumbing Final | Passed | ||
05/15/2024 | ENGR Engineering Final | Passed | ||
05/15/2024 | RSBU - Building Final | Passed | ||
05/15/2024 | RSBU - Building Progress | Passed |