Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01403
Permit Details
Apply Date:
09/06/2023
Applicant:
Paul Schmidt
Description:
SFR F40G22 T22-M0025 Revision-Truss Calcs
Permit Reviews
Permit Number - TC-MDP-0823-01403
Permit Status: Inspections complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/07/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/14/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01403
Permit Status: Inspections complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
07/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
09/07/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
09/07/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
09/07/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/07/2023 | Post-Tension Inspection Report is required. |
09/07/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01403
Permit Status: Inspections complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Date | Description | Comments |
---|---|---|
08/16/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/20/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
09/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01403
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/27/2024 | COT - RSPL - Sewer | Passed | ||
03/27/2024 | COT - RSPL - Rough Soil | Passed | ||
03/27/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/09/2024 | COT - RSBU - Preslab | Passed | ||
04/09/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/09/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
04/25/2024 | COT - RSBU - Roof Nailing | Passed | ||
04/25/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/29/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
05/30/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/12/2024 | COT - RSBU - Interior Shear Bracing | Passed | Plans do not show any interior shear walls. Okay to proceed with tape, texture, and painting of walls and ceiling. | |
06/28/2024 | BULD - Electrical Clearance | Passed | 6/28/24: Passed TEP ECO CLEARANCE issued. | |
07/29/2024 | COT - BULD - SWG Clearance | Passed | Gas pressure test has passed, gas valves are installed at every gas appliance locations. Okay to install meter and turn on gas. | |
08/20/2024 | COT - RSEL - Electrical Final | Passed | ||
08/20/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/20/2024 | COT - RSME - Mechanical Final | Passed | ||
08/20/2024 | COT - RSPL - Plumbing Final | Passed | ||
08/20/2024 | RSBU - Building Progress | Passed | ||
08/23/2024 | ENGR Engineering Final | Passed | Have the landscaper pull all nursery stakes, finials will not be passed unless they are. | |
08/23/2024 | RSBU - Building Final | Passed | 8/23/24: Electrical panel cover has been repaired and all other engineering corrections have been made. Okay to issue Certificate of Occupancy. |