Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/19/2023
Applicant:
Celina Rodriguez
Description:
SFR BT2013-140 T22-M0036

Permit Reviews

Permit Number - TC-MDP-0823-01368
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Start Date Submittal Complete Date Status  
09/19/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/21/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01368
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Total Outstanding Activity Conditions - 4
Date Name
09/19/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/20/2023 Post-Tension Inspection Report is required.
09/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0823-01368
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Date Description Comments
08/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01368
Permit Description: SFR BT2013-140 T22-M0036
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/05/2023 COT - RSPL - Rough Soil Passed
10/05/2023 COT - RSPL - Yard Water Line Passed
10/05/2023 COT - RSPL - Sewer Passed
10/11/2023 COT - RSBU - Preslab Passed
10/11/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/11/2023 COT - RSEL - Electrical Underground Passed
10/11/2023 COT - RSEL - Grounding/Bonding Passed
11/06/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/06/2023 COT - RSBU - Roof Nailing Passed
12/13/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall.
12/13/2023 COT - RSPL - Gas Pressure Test Passed Gas line is holding 15# of air pressure. Okay to proceed.
12/28/2023 COT - RSBU - Interior Shear Bracing Passed
12/29/2023 BULD - Electrical Clearance Passed
02/02/2024 COT - BULD - SWG Clearance Passed SWG to meter only
02/22/2024 COT - RSEL - Electrical Final Passed
02/22/2024 COT - RSEL - Outdoor Lighting Passed
02/22/2024 COT - RSME - Mechanical Final Passed
02/22/2024 COT - RSPL - Plumbing Final Passed
02/22/2024 RSBU - Building Final Passed
02/22/2024 RSBU - Building Progress Passed
02/29/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA II 12 SIC-2023-09-19_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 12 REVISED START_V1.PDF DOCUMENTS VIEW