Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/09/2023
Applicant:
Andrea Flood
Description:
SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)

Permit Reviews

Permit Number - TC-MDP-0823-01361
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Start Date Submittal Complete Date Status  
08/10/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/17/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01361
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Outstanding Activity Conditions - 7
Date Name
01/18/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/18/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
07/20/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/10/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/10/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/10/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/14/2023 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0823-01361
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Date Description Comments
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01361
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/05/2023 COT - RSPL - Rough Soil Passed
09/05/2023 COT - RSPL - Sewer Passed
09/13/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/13/2023 COT - RSBU - Preslab Passed
09/13/2023 COT - RSEL - Grounding/Bonding Passed
09/13/2023 COT - RSEL - Electrical Underground Passed
10/03/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/03/2023 COT - RSBU - Roof Nailing Passed
11/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/21/2023 BULD - Electrical Clearance Passed TEP ECO
11/29/2023 COT - RSPL - Gas Pressure Test Passed
02/16/2024 COT - RSBU - Interior Shear Bracing Passed
04/24/2024 COT - BULD - SWG Clearance Passed Gas line has been pressure tested, all gas appliance locations have shut off valves attached to gas piping. Okay to install meter and turn on gas.
04/24/2024 COT - FCON - Sprinkler - Final Passed
05/07/2024 COT - RSEL - Electrical Final Passed
05/07/2024 COT - RSEL - Outdoor Lighting Passed
05/07/2024 COT - RSME - Mechanical Final Passed
05/07/2024 COT - RSPL - Plumbing Final Passed
05/07/2024 COT - RSPL - Yard Water Line Passed
05/07/2024 RSBU - Building Final Passed
05/07/2024 RSBU - Building Progress Passed
05/07/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-09_V1.PDF DOCUMENTS VIEW