Permit: TC-MDP-0823-01352
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12766 E TORTOISE CANYON LN
Address NEW:
12766 E TORTOISE CANYON LN
Apply Date:
08/22/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55I T21-M0086
Permit Reviews
Permit Number - TC-MDP-0823-01352
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/26/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2023 | APPROVED |
| 08/23/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/28/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01352
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/23/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/23/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/23/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/23/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 08/28/2023 | Post-Tension Inspection Report is required. |
| 08/28/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01352
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Date | Description | Comments |
|---|---|---|
| 09/26/2023 | NO FINAL UNTIL THE DISCHARGE AUTHORIZATIONFOR #P21SD00033 IS ISSUED BY PDEQ | |
| 05/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01352
Permite Description: SFR RKF55I T21-M0086
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Missing box for dryer vent/gas line and soldered connection with 12" of pex lines connection, code requires 18" separation. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01352
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2024 | COT - RSPL - Rough Soil | Passed | ||
| 03/06/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 03/06/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 03/06/2024 | COT - RSPL - Sewer | Passed | ||
| 03/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/21/2024 | COT - RSBU - Preslab | Passed | ||
| 03/21/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 03/21/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/11/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 04/15/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/15/24: Anchor bolts and/or Hilti pins have been installed in base plate of shear walls. Framers have blocked both sides of wall in bedroom #3. Okay to proceed with dry-in of exterior walls and roof. | |
| 05/10/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# of compressed air with no leaks. Okay to proceed. | |
| 05/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5/24/24: Dryer box has been added, solder connections have been corrected. Okay to proceed with installation of insulation and drywall. | |
| 05/28/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 06/05/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly installed on all 3 interior shear walls per the plans. Okay to proceed with tape, texture, and painting walls and ceilings. | |
| 08/14/2024 | COT - RSEL - Electrical Final | Passed | Electrical panel is properly labeled with AFCI & GFCI breakers. All electrical fixtures are installed and operational. | |
| 08/14/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed and functional per plan and city requirements. | |
| 08/21/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed on all gas appliance locations. Okay to install meter and turn on gas. SWG Clearance issued for 12766 E Tortoise Canyon Lane. | |
| 08/21/2024 | COT - RSME - Mechanical Final | Passed | 8/21/24: Stove exhaust fan is installed properly. Grading and landscaping is installed. SWG Clearance was issued today, contractor will call tomorrow for gas meter installation. | |
| 08/26/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 08/26/2024 | RSBU - Building Progress | Passed | ||
| 08/26/2024 | RSBU - Building Final | Passed | ||
| 08/28/2024 | ENGR Engineering Final | Passed | Move in ready |