Permit: TC-MDP-0823-01343
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12866 E TORTOISE POINTE DR
Address NEW:
12866 E TORTOISE POINTE DR
Apply Date:
10/10/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0823-01343
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/11/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/17/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01343
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/11/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 10/11/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 10/11/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 10/11/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 10/13/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01343
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 10/13/2023 | NO FINAL UNTIL THE DISCHARGE AUTHORIZATIONFOR #P21SD00033 IS ISSUED BY PDEQ | |
| 08/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01343
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2023 | COT - RSPL - Rough Soil | Passed | ||
| 11/14/2023 | COT - RSPL - Sewer | Passed | ||
| 11/14/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 11/22/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/22/2023 | COT - RSBU - Preslab | Passed | ||
| 11/22/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 11/22/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/19/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 01/04/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/01/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 02/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 02/01/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 02/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/01/2024 | COT - BULD - SWG Clearance | Passed | All gas valves are installed with sediment drops. Water heater is connected to gas line, counter top stove is installed but not connected, and gas line is connected for dryer in laundry room, but no dryer is present. SWG Clearance issued. | |
| 05/10/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. AFCI & GFCI breakers are installed in electrical panel for all required outlets in bedrooms, bathrooms, kitchen, garage, and exterior. Okay to issue Certificate of Occupancy once Fire & Engineering approval is completed. | |
| 05/10/2024 | RSBU - Building Progress | Passed | Construction is completed, punch list items are being completed. | |
| 05/10/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. AFCI & GFCI breakers are installed in electrical panel for all required outlets in bedrooms, bathrooms, kitchen, garage, and exterior. Okay to issue Certificate of Occupancy once Fire & Engineering approval is completed. | |
| 05/10/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. AFCI & GFCI breakers are installed in electrical panel for all required outlets in bedrooms, bathrooms, kitchen, garage, and exterior. Okay to issue Certificate of Occupancy once Fire & Engineering approval is completed. | |
| 05/10/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. AFCI & GFCI breakers are installed in electrical panel for all required outlets in bedrooms, bathrooms, kitchen, garage, and exterior. Okay to issue Certificate of Occupancy once Fire & Engineering approval is completed. | |
| 05/10/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is operational and meets plan requirements. | |
| 05/16/2024 | ENGR Engineering Final | Passed |