Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
04/18/2024
Applicant:
Stephanie Bebee
Description:
SFR PVCS1041 T22-M0050

Permit Reviews

Permit Number - TC-MDP-0823-01322
Permit Status: Issued
Permit Description: SFR PVCS1041 T22-M0050
Start Date Submittal Complete Date Status  
08/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/06/2024 APPROVED Review Details
04/19/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/26/2024 APPROVED Review Details
07/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/29/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0823-01322
Permit Status: Issued
Permit Description: SFR PVCS1041 T22-M0050
Date Description Comments
01/03/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/29/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/29/2024 Post-Tension Inspection Report is required.
08/03/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/29/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0823-01322
Permite Description: SFR PVCS1041 T22-M0050
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/07/2024 COT - RSBU - Roof Nailing N/A Not Applicable 11/7/24 N/A
11/13/2024 ENGR Engineering Final N/A Not Ready Post address
Finish driveway
No landscaping has even been started

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0823-01322
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/30/2024 COT - RSPL - Backwater Valve Passed
05/30/2024 COT - RSPL - Rough Soil Passed
05/30/2024 COT - RSPL - Sewer Passed
05/30/2024 COT - RSPL - Yard Water Line Passed
06/06/2024 COT - RSBU - Preslab Passed
06/06/2024 COT - RSEL - Electrical Underground Passed
06/06/2024 COT - RSEL - Grounding/Bonding Passed
06/06/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/10/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/29/2024 BULD - Electrical Clearance Passed
07/31/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
08/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/16/2024 COT - RSPL - Gas Pressure Test Passed
09/03/2024 COT - RSBU - Interior Shear Bracing Passed
11/05/2024 COT - BULD - SWG Clearance Passed
11/07/2024 RSBU - Building Progress Passed
11/07/2024 COT - RSME - Mechanical Final Passed 11/7/24 PASS
11/07/2024 COT - RSEL - Outdoor Lighting Passed 11/7/24 PASS
11/07/2024 COT - RSEL - Electrical Final Passed 11/7/24 PASS
11/13/2024 COT - RSPL - Plumbing Final Passed 11/13/24: Plumber has completed all repairs. Construction is completed per plans. Okay to issue Certificate of Occupancy.
11/13/2024 RSBU - Building Final Passed Construction is completed per plans. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
148067 PT LOT 60 COMPLETE-2024-08-05_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 60 PP FOR PERMIT _V1.PDF DOCUMENTS VIEW
CBT 60 PT CERT -2024-04-18_V1.PDF DOCUMENTS VIEW