Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/13/2024
Applicant:
Stephanie Bebee
Description:
SFR CVPLAN2.5 T22-M0062 V2 Structural changes

Permit Reviews

Permit Number - TC-MDP-0823-01321
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062 V2 Structural changes
Start Date Submittal Complete Date Status  
02/16/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 02/26/2024 APPROVED Review Details
07/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/29/2024 APPROVED Review Details
02/14/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/14/2024 REQUIRES RESUBMIT Review Details
06/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/21/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0823-01321
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062 V2 Structural changes
Date Description Comments
02/14/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/20/2024 Post-Tension Inspection Report is required.
08/03/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/29/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/20/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01321
Permite Description: SFR CVPLAN2.5 T22-M0062 V2 Structural changes
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
03/22/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 3/22/24: clean out all perimeter of footings,
03/22/2024 COT - RSBU - Preslab N/A Re-inspection required 3/22/24: clean out all perimeter of footings,

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01321
Permit Description: SFR CVPLAN2.5 T22-M0062 V2 Structural changes
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/15/2024 COT - RSPL - Yard Water Line Passed Water line is connected to main supply with City meter attached and under line pressure with no leaks. Tracer wire is in place. Okay to shade pipe and backfill trench.
03/15/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches.
03/15/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches.
03/15/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches.
03/22/2024 COT - RSEL - Electrical Underground Passed
03/22/2024 COT - RSEL - Grounding/Bonding Passed
03/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/26/2024 COT - RSBU - Preslab Passed
04/22/2024 COT - RSBU - Roof Nailing Passed
04/24/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/28/2024 BULD - Electrical Clearance Passed TEP ECO
06/12/2024 COT - RSPL - Gas Pressure Test Passed
06/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/01/2024 COT - RSBU - Interior Shear Bracing Passed
08/26/2024 COT - BULD - SWG Clearance Passed 8/26/24: SWG CLEARANCE METER TAG
09/05/2024 COT - RSEL - Electrical Final Passed
09/05/2024 COT - RSEL - Outdoor Lighting Passed
09/05/2024 COT - RSME - Mechanical Final Passed
09/05/2024 COT - RSPL - Plumbing Final Passed
09/05/2024 ENGR Engineering Final Passed
09/05/2024 RSBU - Building Final Passed
09/05/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
146482 PT LOT 66 COMPLETE-2024-06-14_V1.PDF DOCUMENTS VIEW
CBT 66 PP WITH CORRECT ADDRESS_V2.PDF DOCUMENTS VIEW
CBT 66 PT CERT-2024-02-13_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW