Permit: TC-MDP-0823-01320
Permit Details
Apply Date:
09/18/2023
Applicant:
Stephanie Bebee
Description:
SFR PVCS1041 T22-M0050
Permit Reviews
Permit Number - TC-MDP-0823-01320
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/19/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/21/2023 | APPROVED |
12/20/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/21/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01320
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date | Description | Comments |
---|---|---|
01/03/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/20/2023 | Post-Tension Inspection Report is required. | |
08/03/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01320
Permite Description: SFR PVCS1041 T22-M0050
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2023 | COT - RSPL - Yard Water Line | N/A | Re-inspection required | 10/9/23: no hose bib or pressure gauge |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01320
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2023 | COT - RSPL - Sewer | Passed | ||
10/09/2023 | COT - RSPL - Rough Soil | Passed | ||
10/09/2023 | COT - RSPL - Backwater Valve | Passed | ||
10/12/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/12/2023 | COT - RSBU - Preslab | Passed | ||
10/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/12/2023 | COT - RSEL - Electrical Underground | Passed | ||
11/15/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/15/2023 | COT - RSBU - Roof Nailing | Passed | ||
01/17/2024 | BULD - Electrical Clearance | Passed | TEP ECO CLEARANCE ISSUED, ground Connected to the Ufer ground in footing. | |
01/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/31/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
03/04/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly installed and screwed off. Okay to proceed with tape, texture, and paint. | |
03/04/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Drywall is properly installed and screwed per plans for fire walls in bedroom #2, kitchen, and master bedroom bathroom. Okay to tape, texture, and paint all walls and ceilings. | |
05/09/2024 | COT - BULD - SWG Clearance | Passed | ||
05/15/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
05/15/2024 | COT - RSME - Mechanical Final | Passed | ||
05/15/2024 | COT - RSPL - Plumbing Final | Passed | ||
05/15/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/15/2024 | RSBU - Building Progress | Passed | ||
05/22/2024 | COT - RSEL - Electrical Final | Passed | ||
05/22/2024 | ENGR Engineering Final | Passed | ||
05/22/2024 | RSBU - Building Final | Passed |