Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1869 S POETRY LN
Apply Date:
09/15/2023
Applicant:
Stephanie Bebee
Description:
PVCS1500 T22-M0040 SFR

Permit Reviews

Permit Number - TC-MDP-0823-01317
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date Submittal Complete Date Status  
11/29/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/29/2023 APPROVED Review Details
09/15/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/19/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0823-01317
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date Description Comments
09/18/2023 Post-Tension Inspection Report is required.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01317
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/12/2023 COT - RSPL - Yard Water Line N/A Re-inspection required
10/12/2023 COT - RSPL - Sewer N/A Partial Pass 10/12/23: revision in review for clean out relocation okay to proceed at own risk
02/14/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 2/14/24: missing anchor bolts at break in plates and shear walls. Missing exhaust fan at main bathroom.
2/15/24: exhaust fan in main bathroom not wired.
03/07/2024 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Not Applicable
05/22/2024 COT - RSEL - Electrical Final N/A Re-inspection required 5/22/24: missing floor receptacle
05/22/2024 RSBU - Building Final N/A Re-inspection required 5/22/23: missing floor receptacle

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01317
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date Description Inspector Results Comments
10/12/2023 COT - RSPL - Rough Soil Passed
10/12/2023 COT - RSPL - Backwater Valve Passed
10/18/2023 COT - RSEL - Grounding/Bonding Passed Footing are properly dug. Rebar reinforcement, post-tension cabling, and shear wall hold downs are in place. Ufer ground is properly positioned in footing. Underground electrical for kitchen island is in place. Okay to proceed with concrete pour.
10/18/2023 COT - RSEL - Electrical Underground Passed Footing are properly dug. Rebar reinforcement, post-tension cabling, and shear wall hold downs are in place. Ufer ground is properly positioned in footing. Underground electrical for kitchen island is in place. Okay to proceed with concrete pour.
10/18/2023 COT - RSBU - Preslab Passed Footing are properly dug. Rebar reinforcement, post-tension cabling, and shear wall hold downs are in place. Ufer ground is properly positioned in footing. Underground electrical for kitchen island is in place. Okay to proceed with concrete pour.
10/18/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Footing are properly dug. Rebar reinforcement, post-tension cabling, and shear wall hold downs are in place. Ufer ground is properly positioned in footing. Underground electrical for kitchen island is in place. Okay to proceed with concrete pour.
11/27/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/27/2023 COT - RSBU - Roof Nailing Passed Roof sheathing is properly nailed off. H2.5 clips are installed on all roof joists.
01/19/2024 BULD - Electrical Clearance Passed TE- ECO Clearance issued.
02/14/2024 COT - RSPL - Gas Pressure Test Passed
02/15/2024 COT - RSPL - Yard Water Line Passed
02/15/2024 COT - RSPL - Sewer Passed
02/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/07/2024 COT - RSBU - Interior Shear Bracing Passed
03/08/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed Drywall is properly installed on exterior fire rated walls and screwed per plan details. Okay to tape, texture, and paint walls and ceilings.
05/22/2024 COT - BULD - SWG Clearance Passed SWG for meter only
05/22/2024 COT - RSEL - Outdoor Lighting Passed
05/22/2024 COT - RSME - Mechanical Final Passed
05/22/2024 COT - RSPL - Plumbing Final Passed
05/22/2024 ENGR Engineering Final Passed
05/22/2024 RSBU - Building Progress Passed
05/24/2024 COT - RSEL - Electrical Final Passed
05/24/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 46-2023-11-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 46 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT 46 PT CERT-2023-09-15_V1.PDF DOCUMENTS VIEW