Permit: TC-MDP-0823-01315
Permit Details
Apply Date:
08/25/2023
Applicant:
Stephanie Bebee
Description:
PVCS1500 T22-M0040 SFR
Permit Reviews
Permit Number - TC-MDP-0823-01315
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/17/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/17/2023 | APPROVED |
08/25/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/30/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01315
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date | Description | Comments |
---|---|---|
08/25/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/28/2023 | Post-Tension Inspection Report is required. | |
08/03/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/28/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01315
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/03/2023 | COT - RSPL - Yard Water Line | N/A | Canceled | 10/3/23: canceled by mark |
01/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1/16/24: nail plates missing throughout |
01/16/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | 1/16/24: not ready |
02/05/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Not Applicable | |
10/03/2023 | COT - RSPL - Backwater Valve | N/A | Canceled | 10/3/23: canceled by mark |
10/03/2023 | COT - RSPL - Rough Soil | N/A | Canceled | 10/3/23: canceled by mark |
10/03/2023 | COT - RSPL - Sewer | N/A | Canceled | 10/3/23: canceled by mark |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01315
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2023 | COT - RSPL - Yard Water Line | Passed | ||
10/12/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/12/2023 | COT - RSEL - Electrical Underground | Passed | ||
11/07/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/07/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/21/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
01/16/2024 | BULD - Electrical Clearance | Passed | 1/16/24: ECO | |
01/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/18/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
02/07/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Drywall for fire walls is properly installed and screwed per plans. Okay to proceed with tape and texture of all walls and ceiling. | |
03/26/2024 | COT - BULD - SWG Clearance | Passed | ||
04/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/05/2024 | COT - RSBU - Preslab | Passed | Outdoor lighting is properly installed per plans. | |
04/05/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them. | |
04/05/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed per plans. | |
04/05/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them. | |
04/05/2024 | COT - RSPL - Backwater Valve | Passed | 4/5/24: Plans onsite show revisions to have backwater valve and clean outs in front of garage. | |
04/05/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them. | |
04/05/2024 | COT - RSPL - Rough Soil | Passed | 4/5/24: Plans onsite show revisions to have backwater valve and clean outs in front of garage. | |
04/05/2024 | COT - RSPL - Sewer | Passed | 4/5/24: Plans onsite show revisions to have backwater valve and clean outs in front of garage. | |
04/05/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them. | |
04/10/2024 | RSBU - Building Progress | Passed | ||
04/10/2024 | ENGR Engineering Final | Passed | Please get your house numbers/address on before calling inspection. |