Permit: TC-MDP-0823-01313
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12729 E TORTOISE POINTE DR
Address NEW:
12729 E TORTOISE POINTE DR
Apply Date:
08/18/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKK35G T21-M0090
Permit Reviews
Permit Number - TC-MDP-0823-01313
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/26/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2023 | APPROVED |
| 08/18/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/21/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01313
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/18/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/18/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/18/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/18/2023 | Post-Tension Inspection Report is required. |
| 08/18/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 08/18/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01313
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
| Date | Description | Comments |
|---|---|---|
| 09/26/2023 | NO FINAL UNTIL THE DISCHARGE AUTHORIZATIONFOR #P21SD00033 IS ISSUED BY PDEQ | |
| 08/02/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01313
Permite Description: SFR RKK35G T21-M0090
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2024 | RSBU - Building Final | N/A | Re-inspection required | 9/10/24 Missing post tension tag, and receptacle at garbage disposal requires GFCI protection. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01313
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2024 | COT - RSPL - Rough Soil | Passed | ||
| 04/12/2024 | COT - RSPL - Sewer | Passed | ||
| 04/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 04/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 04/29/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 04/29/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab. | |
| 04/29/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 05/21/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 05/24/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/10/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/24/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/10/2024 | BULD - Electrical Clearance | Passed | Ground wire is connected to Ufer ground and gas pipe. ECO Clearance issued to TEP. Okay to energize panel. | |
| 08/26/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 8/26/2024 | |
| 09/10/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/10/2024 | COT - RSME - Mechanical Final | Passed | ||
| 09/10/2024 | ENGR Engineering Final | Passed | Move in ready | |
| 09/13/2024 | COT - RSEL - Electrical Final | Passed | 9/13/24: Post tension tag installed, receptacle at garage disposal is on a GFCI Breaker. Construction is complete. Okay to issue Certificate of Occupancy. | |
| 09/13/2024 | COT - RSPL - Plumbing Final | Passed | 9/13/24: Post tension tag installed, receptacle at garage disposal is on a GFCI Breaker. Construction is complete. Okay to issue Certificate of Occupancy. | |
| 09/13/2024 | RSBU - Building Progress | Passed | 9/13/24: Post tension tag installed, receptacle at garage disposal is on a GFCI Breaker. Construction is complete. Okay to issue Certificate of Occupancy. | |
| 09/13/2024 | RSBU - Building Final | Passed | 9/13/24: Post tension tag installed, receptacle at garage disposal is on a GFCI Breaker. Construction is complete. Okay to issue Certificate of Occupancy. |