Permit: TC-MDP-0726-00580
Permit Details
Status:
In Review
Type:
Model Building Permit
Address:
376 N BOATHOUSE LN
Address NEW:
376 N BOATHOUSE LN
Apply Date:
07/21/2026
Applicant:
Celina Rodriguez
Description:
Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)
Permit Reviews
Permit Number - TC-MDP-0726-00580
Permit Status: In review
Permit Description: Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/23/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/31/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0726-00580
Permit Status: In review
Permit Description: Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/13/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 07/13/2026 | MANUAL J |
| 07/13/2026 | Post-Tension Inspection Report is required. |
| 07/29/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/29/2026 | Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0726-00580
Permit Status: In review
Permit Description: Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)
| Date | Description | Comments |
|---|---|---|
| 07/13/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/13/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: In Review
Permit Number: TC-MDP-0726-00580
Permit Description: Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2026 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/14/2026 | |
| 08/14/2026 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/14/2026 | |
| 08/14/2026 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/14/2026 | |
| 08/21/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed | |
| 08/21/2026 | COT - RSBU - Preslab | Passed | Passed | |
| 09/01/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed | |
| 09/01/2026 | COT - RSBU - Roof Nailing | Passed | Passed | |
| 09/16/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/16/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 09/29/2026 | BULD - Electrical Clearance | Passed | 09/29/2026 Clearance TEP ECO. |
|
| 09/29/2026 | COT - RSBU - Interior Shear Bracing | Passed | 09/29/2026 Approved per plan. |
|
| 11/13/2026 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 11/13/2026 |