Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Model Building Permit
Address NEW:
366 N BOATHOUSE LN
Apply Date:
07/14/2026
Applicant:
Celina Rodriguez
Description:
Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)

Permit Reviews

Permit Number - TC-MDP-0726-00578
Permit Status: Needs resubmittal
Permit Description: Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)
Start Date Submittal Complete Date Status  
11/12/2026 SPECIAL INSPECTION REVIEW v.1 11/13/2026 REQUIRES RESUBMIT Review Details
07/17/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 07/24/2026 APPROVED Review Details
11/10/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/12/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0726-00578
Permit Status: Needs resubmittal
Permit Description: Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)
Total Outstanding Activity Conditions - 3
Date Name
07/13/2026 MANUAL J
07/13/2026 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/23/2026 Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required.

Conditions

Permit Number - TC-MDP-0726-00578
Permit Status: Needs resubmittal
Permit Description: Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)
Date Description Comments
07/13/2026 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
07/13/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/13/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Needs Resubmittal
Permit Number: TC-MDP-0726-00578
Permite Description: Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/12/2026 COT - RSEL - Electrical Final N/A Re-inspection required 11/12/2026 Front landscaping incomplete. Mechanical incomplete in attic space.
Add screws to electrical panel door. Provide post tension tag at hose bib. Secure unit to pad.
11/12/2026 COT - RSME - Mechanical Final N/A Re-inspection required 11/12/2026 Front landscaping incomplete. Mechanical incomplete in attic space.
Add screws to electrical panel door. Provide post tension tag at hose bib. Secure unit to pad.
11/12/2026 ENGR Engineering Final N/A Partial Pass Outstanding conditions need to be satisfied prior to final.
11/12/2026 RSBU - Building Final N/A Re-inspection required 11/12/2026 Ensure all conditions are satisfied prior to final. Front landscaping incomplete. Mechanical incomplete in attic space.
Add screws to electrical panel door. Provide post tension tag at hose bib. Secure unit to pad.

Completed Inspections

Permit Status: Needs Resubmittal
Permit Number: TC-MDP-0726-00578
Permit Description: Enclaves at Tumamoc 0979 Plan (Model Master Plan TC-MDP-1225-00791)
Total Completed Inspections - 17
Date Description Inspector Results Comments
08/04/2026 COT - RSPL - Rough Soil Passed
08/04/2026 COT - RSPL - Sewer Passed
08/04/2026 COT - RSPL - Yard Water Line Passed
08/10/2026 COT - RSBU - Excavation/Rebar/Zoning Passed Passed
08/10/2026 COT - RSBU - Preslab Passed Passed
08/10/2026 COT - RSEL - Electrical Underground Passed Passed
08/19/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/19/2026 COT - RSBU - Roof Nailing Passed
09/01/2026 COT - RSPL - Gas Pressure Test Passed Passed
09/02/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed
09/18/2026 COT - RSBU - Interior Shear Bracing Passed
09/23/2026 BULD - Electrical Clearance Passed 9-23-26 ECO clearance approved
11/04/2026 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 11/4/2026
11/12/2026 COT - RSEL - Grounding/Bonding Passed
11/12/2026 COT - RSEL - Outdoor Lighting Passed
11/12/2026 COT - RSPL - Plumbing Final Passed
11/12/2026 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
TUMAMOC - LOT 17 START_V1.PDF DOCUMENTS VIEW
TUMAMOC 17 SIC-2026-07-14_V1.PDF DOCUMENTS VIEW