Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
07/09/2025
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom 1262 Plan (Model master plan TC-MDP-0725-00410)

Permit Reviews

Permit Number - TC-MDP-0726-00550
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1262 Plan (Model master plan TC-MDP-0725-00410)
Start Date Submittal Complete Date Status  
07/16/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 07/22/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0726-00550
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1262 Plan (Model master plan TC-MDP-0725-00410)
Total Outstanding Activity Conditions - 3
Date Name
07/09/2026 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
07/09/2026 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/22/2026 Post-Installed Anchor Inspection Report is required.

Conditions

Permit Number - TC-MDP-0726-00550
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1262 Plan (Model master plan TC-MDP-0725-00410)
Date Description Comments
07/09/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/09/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0726-00550
Permit Description: Mirador Ridge Blossom 1262 Plan (Model master plan TC-MDP-0725-00410)
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/12/2026 COT - RSPL - Sewer Passed 8-12-26: sewer line approved. Okay to backfill using shading materials.
08/12/2026 COT - RSPL - Yard Water Line Passed 8-12-26: main water line approved. Okay to backfill using shading materials.
08/12/2026 COT - RSPL - Rough Soil Passed 8-12-26: underground plumbing verified per plans and under test.. Okay to backfill using shading materials.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 89 REVISED START_V1.PDF DOCUMENTS VIEW
MRB 89 SIC-2026-07-09_V1.PDF DOCUMENTS VIEW