Permit: TC-MDP-0725-00407
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6474 E PASEO ALGA
Address NEW:
6474 E PASEO ALGA
Apply Date:
07/29/2025
Applicant:
Brianna Quiroz
Description:
510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Permit Reviews
Permit Number - TC-MDP-0725-00407
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/16/2026 | SPECIAL INSPECTION REVIEW v.3 | 03/16/2026 | APPROVED |
| 02/26/2026 | SPECIAL INSPECTION REVIEW v.2 | 02/26/2026 | REQUIRES RESUBMIT |
| 02/24/2026 | SPECIAL INSPECTION REVIEW v.1 | 02/24/2026 | REQUIRES RESUBMIT |
| 07/31/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 08/07/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0725-00407
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
| Date | Description | Comments |
|---|---|---|
| 08/06/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 07/24/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 07/24/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/06/2025 | Post-Installed Anchor Inspection Report is required. | |
| 08/06/2025 | Post-Tension Inspection Report is required. | |
| 07/24/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/24/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 08/06/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0725-00407
Permite Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 09/03/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 10/08/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 10-8-25: add nails to roof panels at marked areas. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0725-00407
Permit Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 09/03/2025 | COT - RSPL - Rough Soil | Passed | 9.3.2025 Okay to backfill, shading required. |
|
| 09/03/2025 | COT - RSPL - Sewer | Passed | ||
| 09/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9.10.25 APPROVED |
|
| 09/10/2025 | COT - RSBU - Preslab | Passed | 9.10.25 APPROVED |
|
| 09/10/2025 | COT - RSEL - Grounding/Bonding | Passed | 9.10.25 APPROVED |
|
| 10/08/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10-8-25: exterior/interior clips/sheathing /framing approved. | |
| 10/30/2025 | BULD - Electrical Clearance | Passed | 10.30.2025 Clearance TEP ECO. |
|
| 10/31/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10.31.2025 Approved. Added fire foam to top plate penetrations and moved Pex lines 12" away from recessed lights. |
|
| 11/07/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 11/13/2025 | COT - RSPL - Yard Water Line | Passed | 11/13/25 passed, ok to backfill | |
| 03/31/2026 | COT - RSEL - Electrical Final | Passed | 3.31.26 Approved |
|
| 03/31/2026 | COT - RSEL - Outdoor Lighting | Passed | 3.31.26 Approved |
|
| 03/31/2026 | COT - RSME - Mechanical Final | Passed | 3.31.26 Approved |
|
| 03/31/2026 | COT - RSPL - Plumbing Final | Passed | 3.31.26 Approved |
|
| 03/31/2026 | ENGR Engineering Final | Passed | ||
| 03/31/2026 | RSBU - Building Final | Passed | 3.31.26 Approved |
|
| 03/31/2026 | RSBU - Building Progress | Passed | 3.31.26 Approved |