Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6463 E PASEO ALGA
Apply Date:
07/29/2025
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)

Permit Reviews

Permit Number - TC-MDP-0725-00401
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Start Date Submittal Complete Date Status  
05/13/2026 SPECIAL INSPECTION REVIEW v.1 05/13/2026 APPROVED Review Details
07/31/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 08/07/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0725-00401
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Date Description Comments
08/05/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/21/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/05/2025 Post-Installed Anchor Inspection Report is required.
07/21/2025 Post-Tension Inspection Report is required.
07/21/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/21/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
08/05/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0725-00401
Permite Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/30/2025 COT - BULD - SWG Clearance N/A Not Applicable
10/30/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0725-00401
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Completed Inspections - 19
Date Description Inspector Results Comments
10/30/2025 COT - RSEL - Electrical Underground Passed
10/30/2025 COT - RSPL - Rough Soil Passed 10.30.2025
Approved and under test, okay to backfill with shading materials.
10/30/2025 COT - RSPL - Sewer Passed 10.30.2025
Approved and under test, okay to backfill with shading materials.
10/30/2025 COT - RSPL - Yard Water Line Passed 10.30.2025
Approved and under test, okay to backfill with shading materials.
11/04/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 11.04.2025
Approved per site plan.
11/04/2025 COT - RSBU - Preslab Passed 11.04.2025
Approved. Okay for concrete placement.
11/18/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11.18.2025
Approved per plan, added stud to back wall near patio and straps to cabin tie top plates that don't run through.
11/18/2025 COT - RSBU - Roof Nailing Passed 11.18.2025
Approved per plan.
12/10/2025 BULD - Electrical Clearance Passed 12.9.25
Approved for eco
12/10/2025 COT - RSEL - Grounding/Bonding Passed 12.10.25
Approved
12/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12.11.25
Approved - proceed
12/19/2025 COT - RSBU - Interior Shear Bracing Passed
05/18/2026 COT - RSEL - Electrical Final Passed 5.18.26
Approved
05/18/2026 COT - RSEL - Outdoor Lighting Passed
05/18/2026 COT - RSME - Mechanical Final Passed
05/18/2026 COT - RSPL - Plumbing Final Passed
05/18/2026 ENGR Engineering Final Passed
05/18/2026 RSBU - Building Final Passed 5.18.26
Approved
05/18/2026 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 3 FINAL SIC-2026-05-07_V1.PDF DOCUMENTS VIEW
SOILS REPORT_V1.PDF DOCUMENTS VIEW
Z370 ROOSEVELT TRUSS CALCS - LAYOUTS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 3 PRE SIC-2025-07-29_V1.PDF DOCUMENTS VIEW
LA ESTANCIA LOT 3_V1.PDF DOCUMENTS VIEW