Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
10/14/2025
Applicant:
Angelic Wajszcuk
Description:
REV1: Adjusted location of water service and electrical panel Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)

Permit Reviews

Permit Number - TC-MDP-0725-00399
Permit Status: Complete
Permit Description: REV1: Adjusted location of water service and electrical panel Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Start Date Submittal Complete Date Status  
11/13/2025 SITE FROM MODEL PERMIT - SUBDIVISION REVISION v.1 11/20/2025 APPROVED Review Details
02/20/2026 SITE FROM MODEL PERMIT - SUBDIVISION REVISION v.1 03/04/2026 APPROVED Review Details
07/09/2026 SPECIAL INSPECTION REVIEW v.1 07/10/2026 APPROVED Review Details
10/14/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/14/2025 REQUIRES RESUBMIT Review Details
10/27/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.2 11/05/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0725-00399
Permit Status: Complete
Permit Description: REV1: Adjusted location of water service and electrical panel Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Date Description Comments
11/03/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/21/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/03/2025 Post-Installed Anchor Inspection Report is required.
07/21/2025 Post-Tension Inspection Report is required.
07/21/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/21/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/03/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0725-00399
Permite Description: REV1: Adjusted location of water service and electrical panel Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/05/2026 COT - BULD - SWG Clearance N/A Not Applicable
02/05/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0725-00399
Permit Description: REV1: Adjusted location of water service and electrical panel Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Completed Inspections - 19
Date Description Inspector Results Comments
02/05/2026 COT - RSPL - Rough Soil Passed 2.5.26
Approved
02/05/2026 COT - RSPL - Sewer Passed 2.5.26
Approved
02/05/2026 COT - RSPL - Yard Water Line Passed 2.5.26
Approved
02/10/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 02/10/2026
Approved per site plan, setbacks, foundation details. Ufer in place. Okay for concrete placement.
02/10/2026 COT - RSBU - Preslab Passed 02/10/2026
Approved per site plan, setbacks, foundation details. Ufer in place. Okay for concrete placement.
02/10/2026 COT - RSEL - Electrical Underground Passed
03/03/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/31/2026 BULD - Electrical Clearance Passed 3.31.26
Approved
03/31/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3.31.26
Approved
03/31/2026 COT - RSBU - Roof Nailing Passed 3.31.26
Approved
04/20/2026 COT - RSBU - Interior Shear Bracing Passed
04/20/2026 COT - RSEL - Grounding/Bonding Passed 04/20/2026
Tied into main panel, verified at mud ring.
06/23/2026 COT - RSEL - Electrical Final Passed
06/23/2026 COT - RSEL - Outdoor Lighting Passed
06/23/2026 COT - RSME - Mechanical Final Passed
06/23/2026 COT - RSPL - Plumbing Final Passed
06/23/2026 RSBU - Building Progress Passed
07/17/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
07/17/2026 RSBU - Building Final Passed 7-17-26 Approved

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
BLOCK 8 LOT 54 FINAL SIC-2026-06-30_V1.PDF DOCUMENTS VIEW
SOILS REPORT BLOCK 8_V1.PDF DOCUMENTS VIEW
Z370 ROOSEVELT TRUSS CALCS - LAYOUTS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
ENGINEERING LETTER NARRATIVE - BELLA VITA 2025_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PLOT PLAN REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 8 LOT 54 SIC-2025-10-13_V1.PDF DOCUMENTS VIEW
LA ESTANCIA PARCEL 8 LOT 54 START_V2.PDF DOCUMENTS VIEW