Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/23/2025
Applicant:
Angelic Wajszcuk
Description:
REV1: Electrical Updates Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)

Permit Reviews

Permit Number - TC-MDP-0725-00397
Permit Status: Complete
Permit Description: REV1: Electrical Updates Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Start Date Submittal Complete Date Status  
07/23/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 07/30/2025 APPROVED Review Details
02/20/2026 SITE FROM MODEL PERMIT - SUBDIVISION REVISION v.1 03/04/2026 APPROVED Review Details
06/18/2026 SPECIAL INSPECTION REVIEW v.1 06/22/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0725-00397
Permit Status: Complete
Permit Description: REV1: Electrical Updates Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Date Description Comments
07/25/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/18/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/25/2025 Post-Installed Anchor Inspection Report is required.
07/18/2025 Post-Tension Inspection Report is required.
07/18/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/18/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/25/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0725-00397
Permite Description: REV1: Electrical Updates Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/05/2026 COT - BULD - SWG Clearance N/A Not Applicable 2.5.26
Na
02/05/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable
02/10/2026 COT - RSEL - Grounding/Bonding N/A Partial Pass 02/10/2026
Ufer in place.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0725-00397
Permit Description: REV1: Electrical Updates Harding SFR Model La Estancia (roof vent update) (Model master plan TC-MDP-0123-00365)
Total Completed Inspections - 19
Date Description Inspector Results Comments
02/05/2026 COT - RSPL - Rough Soil Passed 2.5.26
Approved
02/05/2026 COT - RSPL - Sewer Passed 2.5.26
Approved
02/05/2026 COT - RSPL - Yard Water Line Passed 2.5.26
Approved
02/10/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 02/10/2026
Approved per site plan, setbacks, foundation details. Ufer in place. Okay for concrete placement.
02/10/2026 COT - RSBU - Preslab Passed 02/10/2026
Approved per site plan, setbacks, foundation details. Ufer in place. Okay for concrete placement.
02/10/2026 COT - RSEL - Electrical Underground Passed
02/24/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/24/2026 COT - RSBU - Roof Nailing Passed
03/04/2026 COT - RSEL - Grounding/Bonding Passed O3/04/2026
Tied into MSP.
03/04/2026 BULD - Electrical Clearance Passed O3/04/2026
Approved clearance TEP ECO.
03/20/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/07/2026 COT - RSBU - Interior Shear Bracing Passed
06/23/2026 COT - RSEL - Electrical Final Passed
06/23/2026 COT - RSEL - Outdoor Lighting Passed
06/23/2026 COT - RSME - Mechanical Final Passed
06/23/2026 COT - RSPL - Plumbing Final Passed
06/23/2026 RSBU - Building Progress Passed
06/30/2026 ENGR Engineering Final Passed
06/30/2026 RSBU - Building Final Passed corrections made, approved

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
BLOCK 8 LOT 55 FINAL SIC-2026-06-15_V1.PDF DOCUMENTS VIEW
SOILS REPORT BLOCK 8_V1.PDF DOCUMENTS VIEW
Z350 HARDING TRUSS CALCS - LAYOUTS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
ENGINEERING LETTER NARRATIVE - BELLA VITA 2025_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 8 LOT 55 SIC-2025-07-23_V1.PDF DOCUMENTS VIEW
LA ESTANCIA PARCEL 8 LOT 55 START_V1.PDF DOCUMENTS VIEW