Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
11/06/2024
Applicant:
Description:
SFR RKF55M T21-M0089 REV 1 (Model Master Plan TC-MDP-1222-00071)

Permit Reviews

Permit Number - TC-MDP-0724-00838
Permit Status: Complete
Permit Description: SFR RKF55M T21-M0089 REV 1 (Model Master Plan TC-MDP-1222-00071)
Start Date Submittal Complete Date Status  
11/14/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/03/2024 APPROVED Review Details
08/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/25/2025 APPROVED Review Details
08/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/22/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0724-00838
Permit Status: Complete
Permit Description: SFR RKF55M T21-M0089 REV 1 (Model Master Plan TC-MDP-1222-00071)
Date Description Comments
11/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/15/2024 Post-Tension Inspection Report is required.
07/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
11/15/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0724-00838
Permite Description: SFR RKF55M T21-M0089 REV 1 (Model Master Plan TC-MDP-1222-00071)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/12/2025 COT - RSME - Mechanical Final N/A Re-inspection required 5/12/25
No attic access, ladder way too short. Please provide ladder tall enough to gain access to attic.
05/12/2025 RSBU - Building Final N/A Re-inspection required 5/12/25
No attic access, ladder way too short. Please provide ladder tall enough to gain access to attic.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0724-00838
Permit Description: SFR RKF55M T21-M0089 REV 1 (Model Master Plan TC-MDP-1222-00071)
Total Completed Inspections - 22
Date Description Inspector Results Comments
01/03/2025 COT - RSPL - Yard Water Line Passed Plumbing per plan, ok to backfill 1/3/25
01/03/2025 COT - RSPL - Sewer Passed Plumbing per plan, ok to backfill 1/3/25
01/03/2025 COT - RSPL - Rough Soil Passed Plumbing per plan, ok to backfill 1/3/25
01/03/2025 COT - RSPL - Backwater Valve Passed Plumbing per plan, ok to backfill 1/3/25
01/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1-14-25, excavation/setbacks approved
01/14/2025 COT - RSBU - Preslab Passed 1-14-25, preslab approved. Okay to pour concrete.
01/14/2025 COT - RSEL - Electrical Underground Passed 1-14-25, approved.
02/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 27 FEB 25.
Pass, engineer letter on site.
03/03/2025 COT - RSBU - Roof Nailing Passed 3 Mar 25
Pass
03/05/2025 COT - RSEL - Grounding/Bonding Passed 3/5/25 passed
03/05/2025 COT - RSPL - Gas Pressure Test Passed Held pressure 3/5/25
03/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/19/2025 BULD - Electrical Clearance Passed Passed 3/19/25 ready for temp power CLEARANCE ECO
03/19/2025 COT - RSBU - Interior Shear Bracing Passed 3/19/25 passed, ok to tape
05/06/2025 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 5/6/2025
05/12/2025 COT - RSEL - Electrical Final Passed
05/12/2025 COT - RSEL - Outdoor Lighting Passed
05/12/2025 COT - RSPL - Plumbing Final Passed
05/12/2025 ENGR Engineering Final Passed Co Ready
05/13/2025 COT - RSME - Mechanical Final Passed 5/13/25
Pass
05/13/2025 RSBU - Building Final Passed 5/13/25
Pass.
08/12/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-11-06_V1.PDF DOCUMENTS VIEW