Permit: TC-MDP-0724-00830
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
5716 E CAMINO DE LAS IGUANAS
Address NEW:
5716 E CAMINO DE LAS IGUANAS
Apply Date:
07/26/2024
Applicant:
Description:
MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299 (Model master plan TC-MDP-0624-00708)
Permit Reviews
Permit Number - TC-MDP-0724-00830
Permit Status: Complete
Permit Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299 (Model master plan TC-MDP-0624-00708)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/26/2025 | APPROVED |
| 02/05/2025 | RESTAMP - RESIDENTIAL v.1 | 02/06/2025 | APPROVED |
| 01/24/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.3 | 02/05/2025 | APPROVED |
| 07/29/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 08/07/2024 | REQUIRES RESUBMIT |
| 08/13/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 08/16/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0724-00830
Permit Status: Complete
Permit Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299 (Model master plan TC-MDP-0624-00708)
| Date | Description | Comments |
|---|---|---|
| 04/02/2025 | HCD Payment of Impact Fees | |
| 01/24/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 07/25/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/06/2024 | Post-Tension Inspection Report is required. | |
| 07/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 07/25/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00830
Permite Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299 (Model master plan TC-MDP-0624-00708)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | 9.18.25 APPROVED |
| 11/14/2025 | RSBU - Building Final | N/A | Re-inspection required | 11.14.2025 Roof tiles not completely set. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00830
Permit Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299 (Model master plan TC-MDP-0624-00708)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2025 | COT - RSPL - Rough Soil | Passed | 8 April 25 Ok to backfill DWV. Please request main water line when ready, do not cover up. |
|
| 04/08/2025 | COT - RSPL - Sewer | Passed | ||
| 04/14/2025 | COT - RSBU - Preslab | Passed | ||
| 04/14/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 4/14/25: reinforcement for footers, Hold downs, Preslab per plan, ok to proceed with concrete placement. | |
| 08/06/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Approved. All corrections were made. 8/6/2025 | |
| 08/06/2025 | COT - RSBU - Roof Nailing | Passed | Approved. All corrections were made. 8/6/2025 | |
| 08/13/2025 | COT - RSPL - Yard Water Line | Passed | Approved 1" PEX yard water line from meter to home, okay to shade fill progress areas | |
| 09/03/2025 | BULD - Electrical Clearance | Passed | 9.3.2025 Clearance for TEP ECO. |
|
| 09/03/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 09/03/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/05/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9.5.2025 All corrections made from prior inspection. |
|
| 09/19/2025 | COT - RSBU - Interior Shear Bracing | Passed | 9-19-25: interior shear bracing approved. Okay for tape & texture. | |
| 11/14/2025 | COT - RSEL - Electrical Final | Passed | ||
| 11/14/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/14/2025 | COT - RSME - Mechanical Final | Passed | ||
| 11/14/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 11/18/2025 | RSBU - Building Final | Passed | 11.18.2025 Corrections verified. |
|
| 11/19/2025 | ENGR Engineering Final | Passed | Site is complete, safe, and accessible. |