Permit: TC-MDP-0724-00828
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
5725 E CALLE DE LA APERTURA
Address NEW:
5725 E CALLE DE LA APERTURA
Apply Date:
07/25/2024
Applicant:
Description:
MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299
Permit Reviews
Permit Number - TC-MDP-0724-00828
Permit Status: Complete
Permit Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 08/06/2024 | APPROVED |
| 06/03/2026 | SPECIAL INSPECTION REVIEW v.1 | 06/03/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0724-00828
Permit Status: Complete
Permit Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299
| Date | Description | Comments |
|---|---|---|
| 07/25/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/06/2024 | Post-Tension Inspection Report is required. | |
| 07/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 07/25/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00828
Permite Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 4-25-25, not applicable. |
| 04/25/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 4-25-25, not applicable. |
| 04/24/2025 | RSBU - Building Final | N/A | Re-inspection required | 4-24-25, connect electrical line set to water heater and lower thermostat to a max height of 54" |
| 04/24/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 4-24-25, connect electrical line set to water heater and lower thermostat to a max height of 54" |
| 04/24/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 4-24-25, connect electrical line set to water heater and lower thermostat to a max height of 54" |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00828
Permit Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 9/23/2024 | |
| 09/23/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 9/23/2024 | |
| 09/23/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 9/23/2024 | |
| 09/25/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/25/2024 | COT - RSBU - Preslab | Passed | ||
| 09/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/27/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-27-24, exterior clips/sheathing and truss bracing verified as per approved plans. Okay to continue with construction. | |
| 11/27/2024 | COT - RSBU - Roof Nailing | Passed | 11-27-24, roof nailing,exterior clips/sheathing and truss bracing verified as per approved plans. Okay to continue with construction. | |
| 11/27/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-27-24, nailing for interior shear bracing verified | |
| 12/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed intermediate 12/27/24 ok to drywall | |
| 04/09/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 04/16/2025 | BULD - Electrical Clearance | Passed | 4/16/25: ECO TEP CLEARANCE FOR 5725 E CALLE DE LA APERTURA | |
| 04/24/2025 | COT - RSPL - Plumbing Final | Passed | 4-24-25, plumbing final approved. | |
| 04/25/2025 | RSBU - Building Progress | Passed | ||
| 04/25/2025 | RSBU - Building Final | Passed | 4-25-25, electrical, mechanical, plumbing, and building final approved. | |
| 04/25/2025 | COT - RSME - Mechanical Final | Passed | 4-25-25, electrical, mechanical, plumbing, and building final approved. | |
| 04/25/2025 | COT - RSEL - Outdoor Lighting | Passed | 4-25-25, outdoor lighting approved. | |
| 04/25/2025 | COT - RSEL - Electrical Final | Passed | 4-25-25, electrical, mechanical, plumbing, and building final approved. | |
| 04/21/2026 | ENGR Engineering Final | Passed | Building is occupied. |