Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/26/2024
Applicant:
Description:
MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299

Permit Reviews

Permit Number - TC-MDP-0724-00827
Permit Status: Complete
Permit Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299
Start Date Submittal Complete Date Status  
07/29/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 08/06/2024 REQUIRES RESUBMIT Review Details
06/03/2026 SPECIAL INSPECTION REVIEW v.1 06/03/2026 APPROVED Review Details
08/27/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.2 08/30/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0724-00827
Permit Status: Complete
Permit Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299
Date Description Comments
07/25/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/06/2024 Post-Tension Inspection Report is required.
07/25/2024 Please submit sewer receipt. Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/25/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0724-00827
Permite Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/24/2025 COT - BULD - SWG Clearance N/A Not Applicable 4-24-25, not applicable.
04/23/2025 RSBU - Building Final N/A Re-inspection required 4-23-25, missing hammer arrestor for dishwasher, lower thermostat to 54"o.c., missing post tension tag on hose bib. Reschedule all finals.
04/21/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0724-00827
Permit Description: MODEL HOME FOR HABITAT FOR HUMANITY MODEL #1299
Total Completed Inspections - 19
Date Description Inspector Results Comments
09/23/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 9/23/2024
09/23/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 9/23/2024
09/23/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 9/23/2024
09/25/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
09/25/2024 COT - RSBU - Preslab Passed
09/25/2024 COT - RSEL - Grounding/Bonding Passed
10/18/2024 BULD - Electrical Clearance Passed 10/18/24: ECO TEP clearance
11/27/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11-27-24, exterior clips/sheathing, truss bracing,nailing on roof verified. Okay to continue with construction.
11/27/2024 COT - RSBU - Roof Nailing Passed 11-27-24, roof nailing, exterior clips/sheathing and truss bracing verified as per approved plans. Okay to continue with construction.
11/27/2024 COT - RSBU - Interior Shear Bracing Passed 11-27-24, nailing for interior shear bracing verified
12/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed intermediate 12/27/24 ok to drywall
01/16/2025 RSBU - Building Progress Passed Drywall nails proper, ok to tape 1/16/25
04/24/2025 COT - RSPL - Plumbing Final Passed 4-24-25, plumbing final approved
04/24/2025 COT - RSEL - Electrical Final Passed 4-24-25, electrical final approved
04/24/2025 RSBU - Building Final Passed 4-24-25, building final approved.
04/24/2025 COT - RSEL - Outdoor Lighting Passed 4-24-25, outdoor lighting approved
04/24/2025 COT - RSME - Mechanical Final Passed 4-24-25, mechanical final approved.
04/24/2025 COT - RSEL - Electrical Underground Passed 4-24-25, previously inspected and approved
04/21/2026 ENGR Engineering Final Passed Building is occupied.

Documents

File Name Document Type  
220583 - CORAZON DEL PUEBLO LOT 02 - PT REPORT-2026-06-03_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
1299-TRUSS CALCS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-HABITAT MODEL 1299 APPROVED DRAWING 6.30.24_V2.PDF DOCUMENTS VIEW
TC-MDP-0724-00827 5733 E CALLE DE LA APERTURA PLOT PLAN 8.6.24_V2.PDF DOCUMENTS VIEW