Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
07/23/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130

Permit Reviews

Permit Number - TC-MDP-0724-00822
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Start Date Submittal Complete Date Status  
04/15/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0724-00822
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 1
Date Name
07/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0724-00822
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Date Description Comments
04/15/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0724-00822
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/02/2025 COT - RSPL - Yard Water Line Passed Plumbing per plan and holds pressure, ok to backfill but leave sewer open for connection and inspection
05/02/2025 COT - RSPL - Rough Soil Passed Plumbing per plan and holds pressure, ok to backfill but leave sewer open for connection and inspection
05/09/2025 COT - RSPL - Sewer Passed Passed 5/9/25
05/12/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
05/12/2025 COT - RSBU - Preslab Passed
05/12/2025 COT - RSEL - Electrical Underground Passed
05/22/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Loose roofing at 3 marked areas, sister stud and anchor bolt needed in bedroom 2
05/27/2025 COT - RSBU - Roof Nailing Passed 5/27/25
All corrections are made.
06/10/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
06/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 6/10/25
06/10/2025 COT - RSPL - Gas Pressure Test Passed Passed 6/10/25
06/23/2025 COT - RSBU - Interior Shear Bracing Passed 6/23/25 passed
06/23/2025 COT - RSEL - Grounding/Bonding Passed 6/23/25 passed
07/28/2025 COT - BULD - SWG Clearance Passed 7/28/25
SOUTHWEST GAS CLEARANCE: SWG
08/07/2025 COT - RSEL - Electrical Final Passed Passed 8/7/25
08/07/2025 COT - RSEL - Outdoor Lighting Passed Passed 8/7/25
08/07/2025 COT - RSME - Mechanical Final Passed Passed 8/7/25
08/07/2025 COT - RSPL - Plumbing Final Passed Passed 8/7/25
08/07/2025 RSBU - Building Final Passed Passed 8/7/25
08/07/2025 RSBU - Building Progress Passed Passed 8/7/25
08/11/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 66 START_V1.PDF DOCUMENTS VIEW