Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/05/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)

Permit Reviews

Permit Number - TC-MDP-0724-00819
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Start Date Submittal Complete Date Status  
12/12/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0724-00819
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Outstanding Activity Conditions - 4
Date Name
07/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/12/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/12/2024 Post-Installed Anchor Inspection Report is required.
12/12/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0724-00819
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Date Description Comments
12/12/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0724-00819
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/07/2025 COT - RSPL - Yard Water Line Passed 01/06/25
Ok to backfill, shading required.
01/07/2025 COT - RSPL - Sewer Passed 01/07/25

Ok to backfill, shading required.
01/07/2025 COT - RSPL - Rough Soil Passed
01/13/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed around tub/shower risers. Okay to pour concrete.
01/13/2025 COT - RSBU - Preslab Passed Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed around tub/shower risers. Okay to pour concrete.
01/13/2025 COT - RSEL - Electrical Underground Passed Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed around tub/shower risers. Okay to pour concrete.
01/29/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1/29/25 pass
01/29/2025 COT - RSBU - Roof Nailing Passed 1/29/25 pass
02/14/2025 BULD - Electrical Clearance Passed Okay to energize panel. TEP ECO Clearance issued for 4729 S Verdin Valley Dr.
02/18/2025 COT - RSEL - Grounding/Bonding Passed 2-18-25, approved
02/18/2025 COT - RSPL - Gas Pressure Test Passed 2-18-25, approved
02/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/19/25 pass
02/28/2025 COT - RSBU - Interior Shear Bracing Passed 28 FEB 25
Passed.
04/10/2025 COT - BULD - SWG Clearance Passed Approved new meter placement - SWG Clearance is required
05/14/2025 COT - RSEL - Electrical Final Passed Passed final 5/14/25
05/14/2025 COT - RSEL - Outdoor Lighting Passed Passed final 5/14/25
05/14/2025 COT - RSME - Mechanical Final Passed Passed final 5/14/25
05/14/2025 COT - RSPL - Plumbing Final Passed Passed final 5/14/25
05/14/2025 RSBU - Building Final Passed Passed final 5/14/25
05/14/2025 RSBU - Building Progress Passed Passed final 5/14/25
05/14/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 58 START_V1.PDF DOCUMENTS VIEW
BTIII 58 SIC-2024-12-05_V1.PDF DOCUMENTS VIEW