Permit: TC-MDP-0724-00819
Permit Details
Apply Date:
12/05/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Permit Reviews
Permit Number - TC-MDP-0724-00819
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0724-00819
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
07/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
12/12/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
12/12/2024 | Post-Installed Anchor Inspection Report is required. |
12/12/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0724-00819
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Date | Description | Comments |
---|---|---|
12/12/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
07/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0724-00819
Permite Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/13/2025 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | Ufer ground is installed in bottom of garage footing. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0724-00819
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/07/2025 | COT - RSPL - Yard Water Line | Passed | 01/06/25 Ok to backfill, shading required. |
|
01/07/2025 | COT - RSPL - Sewer | Passed | 01/07/25 Ok to backfill, shading required. |
|
01/07/2025 | COT - RSPL - Rough Soil | Passed | ||
01/13/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed around tub/shower risers. Okay to pour concrete. | |
01/13/2025 | COT - RSBU - Preslab | Passed | Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed around tub/shower risers. Okay to pour concrete. | |
01/13/2025 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, masa clips and hold downs are properly nailed to form per plan, post tension cabling is properly installed and spaced evenly per plan, underground electrical is in place for kitchen island, all underground plumbing is properly wrapped with foam, Ufer ground is installed in bottom of footer, and rebar reinforcement is installed around tub/shower risers. Okay to pour concrete. | |
01/29/2025 | COT - RSBU - Exterior Clips/Sheathing | Passed | 1/29/25 pass | |
01/29/2025 | COT - RSBU - Roof Nailing | Passed | 1/29/25 pass |